Which test approach will best fit a new project, with little documentation and high probability for bugs?

A.

Exploratory testing

B.

Requirements based testing

C.

Metric based approach

D.

Regression testing

While repotting a defect, which attribute indicates the degree of impact that the defect has on the system?

A.

Priority

B.

Severity

C.

Status

D.

Description

Mark the correct sentences:

* Defects are a result of environmental conditions and are also referred to as "Failures"

* A human mistake may produce a defect

* A system mil totally fail to operate correctly when a failure exists in it

* When a defect exists in a system it may result in a failure

* Defects occur only as a result of technology changes

A.

II, IV

B.

I, II

C.

IV, V

D.

II, III, IV

Which of the following is a typical product risk?

A.

Poor usability of the software

B.

A problem in the code developed by a 3rd party

C.

Low quality of the configuration data, test data and tests

D.

Problem in defining the right requirements

Which ONE of the following options is a PRODUCT risk and NOT a PROJECT risk?

A.

Incorrect calculation logic in the software, leading to inaccurate results.

B.

Poor communication between team members, making project management more difficult.

C.

Staff shortages in the project leading to scheduling problems.

D.

Delays in the delivery of work products by the project team.

Which of the following metrics relates to the number of defects per unit size of a work product?

A.

Requirement coverage

B.

Average operating time until failure

C.

Fault density

D.

Number of executed test cases in relation to non-executed test cases

In maintenance testing, what is the relationship between impact analysis and regression testing?

A.

Impact analysis requires a regression testing for only the tests that have detected faults in previous SW release

B.

There is no relationship between impact analysis and regression testing.

C.

Impact analysis requires a regression testing for all program elements which were newly integrated (new functionalities).

D.

The impact analysis is used to evaluate the amount of regression testing to be performed.

Which or the following would be a key difference between a peer review of code and static analysis of code using a tool?

A.

A peer reviews finds defects while static analysis finds failures.

B.

Static analysis targets the code technically whereas Peer review is applicable to further aspects.

C.

Peer reviews cannot find missing requirements whereas static analysis can

D.

A peer reviews find failures while static analysis finds defects.

An e-commerce site accepts credit cards for processing the payment. The payment processing form has a field for the amount of money to be deducted. The minimum amount of money that can be processed is $10. The credit cards have a limit of $5,000 (Five Thousand). Assume that only integers can be accepted as inputs. Which of the following set of boundary values you will choose for EFFICIENT testing for the amount of money that can be spent?

A.

9.5001

B.

10.5000

C.

10, 11.4999, 5000r 5001

D.

9. 10.5000,5001

You are performing the role of tester on an Agile project. Which of the following tasks would be your responsibility?

i. Understanding, implementing, and updating the test strategy.

II. Ensuring the proper use of testing tools.

Hi. Coaching other team members in the relevant aspects of testing.

iv. Actively collaborating with developers and business stakeholders to clarify requirements, especially in terms of testability, consistency, and completeness.

v. Participating proactively in team retrospective meeting, suggesting and implementing improvements.

Select the correct answer:

A.

i, iv and v

B.

i, ii and iii

C.

i, iii and v

D.

iii. iv and v