New Year Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

ISTQB ISTQB-CTFL - ISTQB Certified Tester Foundation Level (CTFL v4.0)

Page: 12 / 13
Total 406 questions

The whole-team approach:

A.

promotes the idea that all team members should have a thorough understanding of test techniques

B.

is a consensus-based approach that engages the whole team in estimating the user stories

C.

promotes the idea that all team members should be responsible for the quality of the product

D.

is mostly adopted in projects aimed at developing safety-critical systems, as it ensures the highest level of testing independence

Which of the following statements is an example of testing contributing to higher quality?

A.

A test leader writes a test summary report

B.

A project manager asks to a test leader to estimate the test effort

C.

A tester installs a test ten in the lest environment

D.

A tester finds a bug which is resolved prior to release

Which of the following is a task the Author is responsible for, as part of a typical formal review?

A.

Determining the people who will be involved in the review

B.

Recording the anomalies found during the review meeting

C.

Identifying potential anomalies in the work product under review

D.

Fixing the anomalies found in the work product under review

What does the "absence-of-defects fallacy" refer to in software development?

A.

A misconception that software verification is unnecessary

B.

The idea that fixing defects is NOT important to meeting user needs.

C.

The belief that thoroughly testing all requirements guarantees system success.

D.

The need for constant system quality assurance and improvements.

Which of the following statements about error guessing is true?

A.

Error guessing is a system that adopts artificial intelligence to predict whether software components are likely to contain defects or not

B.

Experienced testers, when applying error guessing, rely on the use of a high-level list of what needs to be tested as a guide to find defects

C.

Error guessing refers to the ability of a system or component to continue normal operation despite the presence of erroneous inputs

D.

Experienced testers, when applying error guessing technique, can anticipate where errors, defects and failures have occurred and target their tests at those issues

You are an experienced tester on a project with incomplete requirements and under pressure to deploy.

What type of testing should you do?

A.

Decision-based testing.

B.

Checklist-based testing.

C.

Error guessing.

D.

Exploratory testing.

Which of the following types of tools is BEST suited for determining source code compliance with the guidelines provided by a coding standard?

A.

Containerisation tool

B.

Fault seeding tool.

C.

Static analysis tool.

D.

Test data preparation tool

Which of the following statements is CORRECT about the value added by a tester to release planning?

A.

The tester estimates the testing effort for individual iterations

B.

The tester writes acceptance criteria

C.

The tester breaks down user stories into smaller testing tasks

D.

The tester assesses the testability of the user stories

Which of the following is a test-first approach, where tests that express a shared understanding from stakeholders of how the application is expected to work, are first written in business-readable language (following the Given/When/Then format), and then made executable to drive development?

A.

Test-Driven Development (TDD)

B.

Acceptance Test-Driven Development (ATDD)

C.

Behavior-Driven Development (BDD)

D.

Domain-Driven Design (DDD)

Which of the following statements about testware are correct?

I When closing the test activities, all the testware resources can be uninstalled and released

II All the testware should be subject to Configuration Management

III. The testware. at the end of the project, should be transferred to the organization responsible for maintenance

IV The developers are responsible for the correct installation of the testware

A.

II, Ill

B.

I, Ill

C.

I, IV

D.

II, IV