ISTQB ISTQB-CTFL - ISTQB Certified Tester Foundation Level (CTFL v4.0)
Given the following requirement:
Requirement ID: 2 8
Requirement Description Additional Entrance Fee
Detailed Description
An additional fee of S3 is charged during the weekend, but
1) Visitors aged under 7 are not charged.
2) Visitors aged 7 to 13 inclusive get a 20% discount off the additional fee.
3) Visitors aged greater than 65 get a 50% discount off the additional fee.
Age should be an integer of 0 or above.
Weekend means Friday to Sunday inclusive.
Which of the following statements isNOTcorrect?
Which of the following tasks is MOST LIKELY to be performed by the tester?
Consider the following examples of risks identified in different software development projects
[1]. It may not be possible to generate the expected workloads to run performance tests, due to the poor hardware equipment of the machines (load injectors) that should generate these workloads.
[ii]. A user's session on a web application is not invalidated after a certain period of inactivity (configured by the system administrator) of the user,
[iii]. The test team will not have an adequate requirements specification (since many requirements will still be missing) by the time test design and analysis activities should begin according to the test plan.
[IV]. Following a failure, the system is unable to continue to maintain its pre-failure operation and some data becomes corrupted.
Which of the following statements is TRUE?
Which ONE ofthe following options is NOT a test objective?
Which of the following statements about the testing quadrants is TRUE?
While repotting a defect, which attribute indicates the degree of impact that the defect has on the system?
Which of the following coverage criteria results in the highest coverage for state transition based test cases?
Manager responsibilities in formalreview includes adexceptone of the following:
Which of the following issues cannot be identified by static analysis tools?
In Agile teams, testers closely collaborate with all other team members. This close collaboration could be problematic and result in testing-related organizational risks.
Which TWO of the following organization risks could be encountered?
I.Testers lose motivation and fail at their core tasks.
ii.Close interaction with developers causes a loss of the appropriate tester mindset.
iii.Testers are not able to keep pace with incoming changes in time-constrained iterations.
iv.Testers, once they have acquired technical development or business skills, leave the testing team.