Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

ISTQB ISTQB-CTFL - ISTQB Certified Tester Foundation Level (CTFL v4.0)

Page: 4 / 10
Total 328 questions

Given the following requirement:

Requirement ID: 2 8

Requirement Description Additional Entrance Fee

Detailed Description

An additional fee of S3 is charged during the weekend, but

1) Visitors aged under 7 are not charged.

2) Visitors aged 7 to 13 inclusive get a 20% discount off the additional fee.

3) Visitors aged greater than 65 get a 50% discount off the additional fee.

Age should be an integer of 0 or above.

Weekend means Friday to Sunday inclusive.

Which of the following statements isNOTcorrect?

A.

Thursday is a valid input boundary value.

B.

A minimum of 6 valid test cases are derived from boundary value analysis based on input age.

C.

$3.01 is a valid output boundary value.

D.

7 and 13 are boundary values for the equivalence partition including age 10.

Which of the following tasks is MOST LIKELY to be performed by the tester?

A.

Develop a test strategy and test policy for the organization

B.

Promote and advocate the test team within the organization

C.

Create the detailed test execution schedule

D.

Introduce suitable metrics for measuring test progress

Consider the following examples of risks identified in different software development projects

[1]. It may not be possible to generate the expected workloads to run performance tests, due to the poor hardware equipment of the machines (load injectors) that should generate these workloads.

[ii]. A user's session on a web application is not invalidated after a certain period of inactivity (configured by the system administrator) of the user,

[iii]. The test team will not have an adequate requirements specification (since many requirements will still be missing) by the time test design and analysis activities should begin according to the test plan.

[IV]. Following a failure, the system is unable to continue to maintain its pre-failure operation and some data becomes corrupted.

Which of the following statements is TRUE?

A.

[ii] and [IV] are product risks; [i] and [iii] are project risks

B.

[ii]and [iii] are product risks. [I] and [IV] are project risks.

C.

[i], and [iV] are product risks; [ii] and [iii] are project risks

D.

[i], [II] and [iii] are product risks, [IV] is a project risk.

Which ONE ofthe following options is NOT a test objective?

A.

Verifying whether specified requirements have been fulfilled

B.

Triggering failures and finding defects

C.

Finding errors

D.

Validating whether the test object is complete and works as expected by the stakeholders

Which of the following statements about the testing quadrants is TRUE?

A.

The higher the number of the testing quadrant, the more important the tests associated with this quadrant are

B.

Automated acceptance tests produced during BDD and ATDD are classified in quadrant 02.

C.

Exploratory tests are classified in quadrant Q3, and they are usually included in a continuous integration process.

D.

Automated unit tests produced during TDD are classified in quadrant Q4 as they are technology facing.

While repotting a defect, which attribute indicates the degree of impact that the defect has on the system?

A.

Priority

B.

Severity

C.

Status

D.

Description

Which of the following coverage criteria results in the highest coverage for state transition based test cases?

A.

Can't be determined

B.

Covering all transitions at least once

C.

Covering only start and end states

D.

Covering all states at least once

Manager responsibilities in formalreview includes adexceptone of the following:

A.

Planning the review

B.

Determines if the review objectives have been met

C.

Decide on the execution of reviews

D.

Allocate time for review

Which of the following issues cannot be identified by static analysis tools?

A.

Very low MTBF (Mean Time Between failure)

B.

Potentially endless loops

C.

Referencing a variable with an undefined value

D.

Security vulnerabilities

In Agile teams, testers closely collaborate with all other team members. This close collaboration could be problematic and result in testing-related organizational risks.

Which TWO of the following organization risks could be encountered?

I.Testers lose motivation and fail at their core tasks.

ii.Close interaction with developers causes a loss of the appropriate tester mindset.

iii.Testers are not able to keep pace with incoming changes in time-constrained iterations.

iv.Testers, once they have acquired technical development or business skills, leave the testing team.

A.

ii and iii

B.

i and iii

C.

i and ii

D.

ii and iv