ISTQB ISTQB-CTFL - ISTQB Certified Tester Foundation Level (CTFL v4.0)
Which of the following statements about test estimation approaches is CORRECT?
For a given set of test-cases, which of the following is a benefit of running these tests with a test automation tool?
Which two of the following statements describe the advantages provided by good traceability between the test basis and test work products?
I. Analyzing the impact of changes.
ii. A measure of code quality.
iii. Accurate test estimation.
iv. Making testing auditable.
Select the correct answer:
In which one of the following test techniques are test cases derived from the analysis of the software architecture?
Determining the schedule for each testing activity and test milestones for a test project, using activity estimates, available resources, and other constraints is a typical task performed during
Which of the following activities is NOT a pan of the fundamental testing process?
Which of the following options is a success factor for formal reviews (e.g. inspections)?
The following decision table is used to assist a doctor in determining the drug therapy to prescribe for a patient (aged 6 to 65 years) diagnosed with acute sinusitis. The table consists of three Boolean conditions and six actions
Based only on the given information, which of the following statements is TRUE?
The following part of a business process flow is specified; REPEAT (book a bill) UNTIL (User presses Cancel). How many test cases are necessary in order to achieve 100% branch coverage of the process flow?
Which of the following statements is true?
Select exactly one option (1 out of 4)!