A LEED Building Design and Construction: New Construction office building ' s HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company. The office pays a flat fee for hot water, included as part of the lease. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level

Energy Metering, an energy meter must be installed for

A.

natural gas

B.

hot water at the main service point

C.

nothing, because the flat fee is included as part of the lease

D.

nothing, because the energy source is outside of the project ' s scope

Which of the following is the location of CO2 sensors in naturally ventilated spaces to comply with the Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

A.

At least 6 ft. (2 m) above the floor

B.

At least 3 ft. (1 m) away from windows

C.

Between 3 ft. and 6 ft. (1 m and 2 m) above the floor

D.

On the ceiling 3 ft. (1 m) away from adjacent walls

The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.

Whole-Building Life-Cycle Assessment is a

A.

gate-to-gate assessment

B.

cradle-to-gate assessment

C.

cradle-to-grave assessment

D.

cradle-to-cradle assessment

For minimum acoustic performance, peak-hour is defined as M

A.

lowest noise level over a specified sample time

B.

highest noise level over various periods of time

C.

an energy-average of the noise level over a specified sample time

D.

an energy-average of noise level divided by total sample time and area of the space

In the context of community connectivity, the purpose of promoting walkability in urban planning is to:

A.

Foster social engagement and interaction

B.

Improve public health and encourage active lifestyles

C.

Increase urban density and reduce urban sprawl

A developer is building a new shopping mall in a temperate climate. The developer wants to reduce operating costs and improve occupant experience. Which design scheme should the project team present?

A.

A design that increases peak thermal loads in the office and administrative spaces

B.

A design that reduces the overall parking footprint and provides preferred parking for electric-vehicle charging

C.

A design with a narrow floor plate that maximizes daylight in retail areas and minimizes the need for electric lighting

D.

A design with a large roof that collects rainwater to reduce stormwater runoff

What requirement must be met when creating a Demand Response Program that satisfies Energy and Atmosphere Credit, Demand Response?

A.

Permanently reduce the energy consumption in the building by 5%

B.

Demonstrate submetering of the two highest electrical end uses

C.

Demonstrate a load shift reduction of 5% in the building

D.

Create a comprehensive plan for meeting a demand response event

Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

A.

Install an on-site photovoltaic array

B.

Purchase Green-e certified carbon offsets

C.

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.

Install a ground-source heat pump

A new mixed-use development includes residential units and commercial spaces. The project is in an urban area with existing pedestrian paths and public transportation infrastructure. How can the project team minimize exposure to emissions from vehicle traffic around the property while ensuring compliance with LEED strategies?

A.

Establish mandatory carpooling arrangements for residents and employees

B.

Integrate indoor plants to absorb carbon dioxide

C.

Designate a no-idling zone around the building perimeter

What are the three phases within the Integrative Process Credit, Integrative Process?

A.

Pre-design, Discovery, Design and Construction

B.

Discovery, Design and Construction, Operations and Feedback

C.

Schematic Design, Design and Construction, Operations and Feedback

D.

Design Charrette, Schematic Design, Operations and Feedback