USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED v5 AP BD+C)

Page: 11 / 14
Total 442 questions

When should collaboration start for the integrative process?

A.

Before finalizing the design

B.

During predesign

C.

Before competitive project bidding

D.

Before construction

A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?

A.

A project may not use two alternative water sources

B.

Target the uses that require the least treatment first

C.

Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses

D.

All alternative water sources should be treated to potable water standards

A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?

A.

Sustainable Sites Credit, Rainwater Management

B.

Sustainable Sites Prerequisite, Environmental Site Assessment

C.

Location and Transportation Credit, Sensitive Land Protection

D.

Location and Transportation Credit, High-Priority Site

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public ' s input

Which rating system is being used if all of the credits below have been submitted towards certification?

- Location and Transportation Credit, Reduced Parking Footprint

- Energy and Atmosphere Credit, Fundamental Refrigerant Management

- Indoor Environmental Quality Credit, Acoustic Performance

- Materials and Resources Credit, Persistent, Bio accumulative, and Toxic (PBT) Source Reduction - Lead, Cadmium, and Copper

A.

Building Design and Construction: Schools

B.

Building Design and Construction: Healthcare

C.

Building Design and Construction: Hospitality

D.

Building Design and Construction: Data Centers

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an " anticipated " credit

A mixed-use development project located in an urban area includes office spaces, retail shops, and residential units. Which of the following actions should the project team consider to improve the sustainable transportation strategies for this development?

A.

Reduce the total number of parking spaces in alignment with local regulations

B.

Implement an educational campaign about the benefits of public transportation

C.

Integrate public transportation subsidies for residents

What type of space must have self-closing doors, deck-to-deck partitions, and exhaust fans in order to meet the requirements for Indoor Environmental Quality Credit, Enhanced Air Quality Strategies?

A.

Data closet

B.

Conference room

C.

Chemical storage

D.

Open office

A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

A.

12,500 ft2 (1 160 m2)

B.

15,000 ft2 (1 400 m2)

C.

25,000 ft2 (2 300 m2)

D.

35,000 ft2 (3 250 m2)

For a project located on a greenfield site and attempting the Location and Transportation Credit, Sensitive Land Protection, Option 2, what must the development footprint avoid?

A.

Land that is within 200 ft. (61 m) of a local government wetland demonstration project

B.

Soils that are to be restored according to the SITES Guidelines and Performance Benchmarks 2009. Credit 7.3

C.

Areas not able to meet the criteria for Location and Transportation Credit LEED for Neighborhood Development Location

D.

Prime farmland as defined by the U.S. Code of Federal Regulations or local equivalent outside the US