Which of the following strategies can be used to decrease the envelope load of a building?

A.

Provide summer solar shading

B.

Maximize daylighting

C.

Decrease opaque wall area

D.

Use economizers for free cooling

Which of the following criteria does a project need to implement in order to qualify for Sustainable Sites Credit: Site Development - Protect or Restore Habitat, Option 1?

A.

Use of natural plants rated for their effect in reducing the heat island effect, while also restoring a minimum of 20% (including the building footprint) of all portions of the site identified as previously disturbed

B.

Use of only native or adapted vegetation, along with not restoring a minimum of 36% (including the building footprint) of all portions of the site identified as previously disturbed

C.

Use of native or adapted vegetation, restoring a minimum of 30% (including the building footprint) of all portions of the site identified as previously disturbed

D.

Use of natural vegetation and not artificial greenery, restoring a minimum of 25% (including the building footprint) of all portions of the site identified as previously disturbed

To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

A.

Design guidelines for orientation of parking garages along street frontages

B.

Minimum dimensions for on-street parking spaces required by the zoning code

C.

Building code standards for structured parking garages

D.

Minimum number of parking spaces required by the zoning code

The owner of a large multi-building property is seeking LEED certification. In determining the LEED project boundaries the LEED AP may include non-contiguous parcels of land if

A.

the parcels are used for temporary uses such as parking or staging that is owned and managed by a third party

B.

the parcels directly support or are associated with normal building operations and are accessible to the project's occupants

C.

the parcels are part of an existing public preservation easement or resource protection area that is directly adjacent to the LEED project boundary

D.

the parcels are part of a land trust or conservation organization for which the LEED project provides financial support for in the Sustainable Sites Credit, Site Development Credit, Protect or Restore Habitat, Option 2. Financial Support

What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

A.

Local building code

B.

ASHRAE 62.1-2010

C.

International Mechanical Code 2012

D.

The ventilation code requiring the greatest volume of outside air

Which strategy should be employed to improve daylighting when designing a new building?

A.

Increase the building depth

B.

Increase the number of skylights

C.

Increase the height of interior partitions

D.

Decrease the number of exterior light shelves

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

A.

The general contractor

B.

A LEED AP

C.

The project's mechanical engineer

D.

The owner or an owner's representative

The results of a building energy model show that a building will consume 2,200,435 kilowatt-hours (kWh) per year (building is served solely by electricity). The building owner wants to achieve Energy and Atmosphere Credit, Green Power and Carbon Offsets. What is the minimum amount of green energy required to be purchased on an annual basis?

A.

770,152 kWh

B.

2,200,435 kWh

C.

550,109 kWh

D.

1,100,218 kWh

What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U

A.

Coordinate open space features during the construction phase

B.

Minimize the floor-area ratio (FAR) and accessibility for open space

C.

Design a parking and road footprint layout that is not near open land

D.

Coordinate open space features early during the site planning phase

Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?

A.

Materials and resources

B.

Location and site selection

C.

Regional priority and innovation

D.

Energy and water related systems