USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED v5 AP BD+C)

Page: 14 / 14
Total 442 questions

What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?

A.

Locker rooms

B.

Office of the principal

C.

Health clinic

D.

Auditorium

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

A.

included in the calculation

B.

excluded from the calculation

C.

excluded if the total volume is less than 25% of the building being reused

D.

excluded if the total volume is more than 25% of the building being reused