For a LEED for Neighbor Hood Development project, an important starting point for project certification Is the formulation of overarching goals to guide the project team's work toward successful certification The LEED for Neighborhood Development Reference Guide identities three foundations for goal setting, in addition to the project’s environmental setting and community context, what is the third foundation?

A.

The projects timeline

B.

USGBC's mission

C.

Federal policy

D.

The developer’s mission

Whichof the following innovation proposals is most likely to be successful to achieve Innovation,Option 1:Innovation?

A.

Including locked, Indoor bicycle storage for 100% of project occupants

B.

Being located next to a 20-mi. (32 Km), award-winning bicycle trail

C.

Distributing leaflets to project occupants about available public transit services nearby

D.

Providing an educational program on the environmental and human health benefits of green neighborhood

To meet the requirement of Smart Location and Linkage Credit. Access to Quality Transit, on a

600-ace 1243 hectares) site with 3,500 dwelling units, what Is the minimum number of units that must be within 1/4 mi. (400 m) walk distance of an existing streetcar stop?

A.

350 unite

B.

1,050 units

C.

1,400 units

D.

1,750 units

A project is pursuing Neighborhood Pattern and Design Credit. Local Food Production Restrictions in deeds or covenants, conditions, and restrictions (CC&Rs) may prohibit greenhouses in which location?

A.

Rooftops

B.

Back yards

C.

Side yard facing the circulation network

D.

Front yards facing the circulation network

A local zoning code limits density on a residentially-zoned 10-acre (four hectare) parcel to 65 total units The site la outside ofwalking distance to transit service.Howcould this project be eligible for Neighborhood Pattern and Design Prerequisite Compact Development?

A.

Dedicate 10% of the total land area as a public park

B.

Place 15% of the total land area in private roads and streets

C.

Include 15% of the total land area as a protected community open space easement

D.

Include a recreation building with a development footprint of at least 1.5 acres (0.6 hectare)

What can be omittedfrom the calculation verifying the percentage of reuse of buildings undergoing major renovation?

A.

Roof decking

B.

Structural floor

C.

Exterior skin and framing

D.

Nonstructural roofing material

Which of the following la an eligible source of renewable energy tot Green Infrastructure and Buildings Credit. Renewable Energy Production?

A.

Wind energy

B.

Ground-source Heat pump

C.

Combust on of municipal solid waste

D.

Forest biomass waste other than mill residue

Acultural landscape is identifiedon a project site. Which action contributes to Green Infrastructure and Buildings Credit. Historic Resource Preservation and Adaptive Reuse?

A.

Hire a registered landscape architect to enhance the design of thelandscape

B.

Provide educational case study and signage about the history of the project site

C.

Construct wetlands using nativeplants to improve hydrology, controlstormwater runoff. and provide wildlife habitat

D.

Contact the state historic preservation office of the National Park Service, or local equivalent to determine if the landscape is registered as a historic site

Which of the following credits or prerequisites requires a calculation ofIntersections per square mile for square kilometer)?

A.

neighborhood Pattern and Design Credit. Walkable Streets

B.

Smart Location and Linkage Credit,Bicycle Facilities

C.

Neighborhood Pattern and Design Prerequisite,Connected and Open Community

D.

Smart Location and Linkage Credit. Access to Quality Transit

A LEEDV for Neighborhood Development registered project donates salvaged lumber to a localcommunity organization for their use in buildinglow income housing. What creditcanthis action contribute towards?

A.

GIB Prerequisite Construction Activity Pollution Prevention

B.

GIB Credit Building Reuse

C.

GIB Credit Recycled and Reused Infrashtructure

D.

GIB Credit Solid Waste Management