In which of the following ways can a campus project using a Group Approach comply with Water Efficiency

Prerequisite, Building-Level Water Metering?

A.

Meter water use for each building separately; meter outdoor water use for the associated grounds

B.

Meter water use for the entire campus (buildings and the associated grounds) using a single meter

C.

Meter water use for all buildings aggregately with a single meter; outdoor water use for the associated grounds

does not need to be metered

D.

Meter water use for all buildings aggregately with a single meter; meter outdoor water use for the associated

grounds

What must the project team do in order to maximize the reduction in operational costs with regard to Sustainable Sites Credit, Site Improvement Plan?

A.

Reduce lawn areas

B.

Increase habitat diversity

C.

Increase green space for occupants

D.

Improve water quality of runoff from rainwater

The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to

equal or be greater than 5%. Which strategy can the team implement to achieve this goal?

A.

Install a vegetated roof system

B.

Convert lawn areas to native plants

C.

Mitigate the vegetated area off-site through a land trust

D.

Convert the paved areas of the site to pervious pavement

Who is the best person to serve as the Indoor Environmental Quality Manager to successfully implement Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program?

A.

The LEED AP

B.

A general contractor

C.

The building engineer

D.

A commissioning (Cx) agent

According to Sustainable Sites Credit, Rainwater Management, what is the maximum time allowed to comply with a failed inspection?

A.

30 days

B.

45 days

C.

60 days

D.

90 days

The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?

A.

Install a new high-efficiency chiller

B.

Purchase renewable energy credits

C.

Install new high efficiency urinal flush valves

D.

Provide financial support for off-site conservation

In the calculations for Water Efficiency Prerequisite, Indoor Water Use Reduction, private use refers to lavatory faucets used by which of the following types of occupants?

A.

Prisoners, hospital inpatients, hotel staff

B.

Apartment residents, motel guests, nursing home residents

C.

Students, hospital staff, hotel guests

D.

Dorm residents, fire-station staff, nursing home staff

For existing buildings pursuing LEED certification, the establishment period requirements include which of the following?

A.

Cooling Tower Weekly Meter Readings

B.

Site Management Policy

C.

Alternative Transportation Survey

D.

Occupant Comfort Survey

Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?

A.

Sustainable Sites Credit, Site Management

B.

Materials and Resources Credit, Purchasing - Lamps

C.

Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management

D.

Indoor Environmental Quality Credit, Indoor Air Quality Management Program

If a manufacturer does not specify the calibration interval for the utility meters used for benchmarking building energy performance, the assessment team may specify a reasonable calibration interval not to exceed

A.

one year

B.

two years

C.

three years

D.

five years