New Year Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M)

Page: 3 / 5
Total 166 questions

Which of the following transportation modes can be included as an alternative commuting methodin the calculation for Location and Transportation Credit, Alternative Transportation?

A.

Trips avoided while on vacation

B.

Trips avoided while on business travel

C.

Trips avoided because of telecommuting

D.

Trips avoided by commuting on a motorcycle

Rainwater harvesting can be used for which of the following credits or prerequisites?

A.

Water Efficiency Credit, Water Metering

B.

Water Efficiency Credit, Indoor Water Use Reduction

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction

D.

Water Efficiency Prerequisite, Building-Level Water Metering

A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?

A.

Balance the existing HVAC system

B.

Increase fan capacity to maintain air delivery despite the added resistance

C.

Decrease fan capacity to maintain air delivery despite the added resistance

D.

Replace the existing HVAC system with an air handler that can accommodate the filters

The LEED AP is searching the Addenda Database for LEED Interpretations that pertain to Sustainable Sites Credit,

Light Pollution Reduction. Which interpretations must be used when attempting this credit?

A.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published after the project's registration date that the project thinks is relevant

B.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published on the project's

registration date that the project thinks is relevant

C.

Sustainable Sites Credit, Light Pollution Reduction LEED Interpretation published before the project's

registration date that applies to the project's rating system

D.

Energy and Atmosphere Credit, Optimize Energy Performance LEED Interpretation published before the

project's registration date that applies to the project's rating system

A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

A.

The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system

B.

The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system

C.

The SRI of the vegetated roof system, and the SRI of the colored concrete

D.

The SRI of the colored concrete, and the SRI of the open-grid pavement system

When calculating Water Efficiency Credit, Outdoor Water Use Reduction, the irrigation of athletic fields

A.

must be included in the calculations

B.

must be excluded from the calculations

C.

may be included in or excluded from the calculations

D.

may be calculated using a standard 20% reduction from baseline

What calculation is used to achieve Materials and Resources Credit, Purchasing - Ongoing?

A.

Cost of compliant furniture

B.

Weight of compliant furniture

C.

Cost of both compliant and non-compliant furniture

D.

Weight of compliant and non-compliant furniture

For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy

and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by

A.

conducting an energy audit that develops a commissioning plan for the building's major energy using system

B.

providing a program demonstrating no or low cost measures of improvement to increase energy efficiency

C.

developing a master list of findings identifying systems or pieces of equipment including the defects or problems

and proposed solutions

D.

demonstrating an energy efficiency of at least 25% better than the national average for typical buildings of similar

type based on energy source

Key functional and operational parameters such as occupied hours of a building, use by space type, required temperature settings, and lighting levels, are specified in the

A.

Basis of Design

B.

Design Narrative

C.

Owner Project Requirements

D.

Current Facility Requirements

Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

A.

Implement an alternative transportation program and conduct a transportation survey

B.

Conduct a week long observation of the parking lot usage and estimate the alternative transportation ate

C.

Conduct a transportation survey and demonstrate that the alternative transportation rate has been met

D.

Implement an alternative transportation program and estimate the alternative transportation rate