New Year Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

USGBC LEED-AP-O+M - LEED AP Operations + Maintenance (LEED AP O+M)

Page: 4 / 5
Total 166 questions

A benefit of recommending LED lamps in an environmentally preferable purchasing policy is that they

A.

are rapidly renewable

B.

have no mercury content

C.

are adaptable to all existing fixtures have lower up front costs than fluorescent lamps

The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of

A.

the required 100% impervious surfaces

B.

the required 3% vegetated site area

C.

Water Efficiency Credit, Cooling Tower; Sustainable Sites Credit, Joint Use of Facilities

D.

Sustainable Sites Credit, Site Management; Water Efficiency Credit, Outdoor Water Use Reduction

What is the maximum distance between readings required to represent the illumination levels at the property perimeter to earn the Sustainable Sites Credit, Light Pollution Reduction?

A.

50 ft. (15 m)

B.

80 ft. (24 m)

C.

100 ft. (30 m)

D.

200 ft. (60 m)

Which of the following is an environmentally friendly technology for controlling erosion?

A.

Mulching

B.

Laying asphalt

C.

Laying tarpaulin material

D.

Spraying water to contain dust

Which of the following are required to comply with Energy and Atmosphere Credit, Existing Building Commissioning- Implementation?

A.

Master list of findings

B.

Measurement of ventilation systems

C.

Five-year plan for equipment modification

D.

Detailed energy use breakdown by system

At a minimum, which two factors must be continuously monitored by the system in order to achieveIndoor Environmental Quality Credit, Thermal Comfort?

A.

Air speed and humidity

B.

Humidity and air temperature

C.

Air speed and air temperature

D.

Radiant temperature and air speed

The project team is attempting to achieve Option 1. Lighting Controls in Indoor EnvironmentalQuality Credit, Interior Lighting. Which of the following is required documentation?

A.

Table of lighting controls installed

B.

Manufacturers' data for occupancy sensors

C.

The total area of the building square footage

D.

A photometric chart of the multi-occupant space

A project is pursuing Materials and Resources Credit, Solid Waste Management - Facility Maintenance and Renovation. The project has generated the following waste as part of their Facility Maintenance and Renovation activities: 2,000 lbs. (907.2 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,100 lbs. (498.9 kg) of wood, and 1,500 lbs.

(680.4 kg) of wallboard. If the project has diverted 1,800 lbs. (816.4 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,000 lbs. (453.6 kg) of wood, and 250 lbs. (113.3 kg) of wallboard, what is the actual diversion rate achieved?

A.

70.4% of diversion

B.

71.8% of diversion

C.

75.7% of diversion

D.

82.3% of diversion

A management method that could be included in a project's site management policy is the use of

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Buildings account for what percentage of total energy use?

A.

30%

B.

40%

C.

50%

D.

60%