Innovation credits for exemplary performance are awarded for

A.

reaching 100% threshold

B.

demonstrating significant environmental benefits

C.

achieving the next incremental threshold

D.

demonstrating a quantitative improvement in environmental performance

A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?

A.

Sensor calibration

B.

Test and balance procedures

C.

Cooling tower water management

D.

Operating schedules and requirements

An organization pursuing LEED O+M certification for their headquarters has a renovation policy that includes strict requirements around the selection of building products and requires contractors working in the building to develop a plan for the diversion of waste produced during renovation projects. What must the organization add to their renovation policy to meet the requirements of Materials and Resources Prerequisite, Facility Maintenance and

Renovation Policy?

A.

Requirements around the selection of low-emitting materials for renovation projects

B.

Requirements for contractors to safeguard air quality during renovation

C.

Requirements for the salvage and reuse of furniture within the building

D.

Requirements for contractors to perform construction activity pollution prevention

For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?

A.

Those that represent at least 10% of the total annual consumption of the building minus plug load use

B.

Those that represent at least 15% of the total annual consumption of the building minus plug load use

C.

Those that represent at least 20% of the total annual consumption of the building minus plug load use

D.

Those that represent at least 25% of the total annual consumption of the building minus plug load use

Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?

A.

50

B.

70

C.

76

D.

85

For an office building with few visitors, which of the following actions must the project team do in order to comply with Location and Transportation Credit, Alternative Transportation?

A.

Encourage telecommuting and the use of mass transit

B.

Survey visitors to determine their transportation modes

C.

Survey the occupants to determine their transportation modes

D.

Provide parking for low-emitting vehicles for 5% of the building occupants

Who needs to be surveyed for an in-patient hospital project for Location and Transportation Credit, Alternative Transportation: Option 1. Transportation Survey?

A.

People visiting patients

B.

Hospital employees

C.

Patients being released

D.

Pharmaceutical representatives

Which of the following is considered an ongoing purchase for the purpose of calculating Materials and Resources

Credit, Solid Waste Management - Ongoing?

A.

Office chairs

B.

Mercury-containing lamps

C.

Shelving units

D.

Toner cartridges

Which of the following is a low impact development (LID) technique for rainwater management?

A.

Storm inlet

B.

Rain garden

C.

Detention basin

D.

Impervious pavement