USGBC LEED-Green-Associate - LEED Green Associate GAFRE Exam (LEED GA)

Page: 12 / 13
Total 430 questions

LEED system goals are referred to as

A.

prerequisites

B.

credit categories

C.

impact categories

D.

credit outcome weightings

The Commissioning (Cx) Process has been structured to coincide with the phases of a generic project in which of the following sequences of phases?

A.

OPR, Design, Construction, Operations and Maintenance

B.

Basis of Design (BOD), OPR, Cx, Construction

C.

Pre-Design, Design, Construction, Occupancy and Operations

D.

Basic Design, Construction, Cx, Owner’s Project Requirements (OPR)

What do the credits in the Materials and Resources category focus on?

A.

Reducing the quantity of materials used on a project

B.

Selecting materials that are more energy efficient than traditional building materials

C.

Minimizing the embodied impacts associated With the entire life-cycle of building materials

D.

Helping project teams select materials that have the most environmental benefits at the least cost

Light trespass beyond the project boundary can be prevented by the use of

A.

flood light fixtures

B.

up-lighting fixtures

C.

shielded light fixtures

D.

increasing the number of light fixtures

The interior of a hotel is under renovation. The project designer would like to incorporate adaptive reuse. Which of the following strategies would accomplish this goal?

A.

Relocate to a used building

B.

Reuse the current wood floors as wall panels

C.

Use reconditioned office equipment

D.

Convert the rooms into residential apartments

What organization reviews and provides final LEED certification report to projects?

A.

U.S. Green Building Council

B.

Green Building Initiative (GBI)

C.

Green Business Certification Inc.

D.

ASHRAE

During which stage of the conventional building process are each disciplined practitioner on project teams involved?

A.

Discovery phase

B.

post occupancy phase

C.

End of project discovery phase

D.

As required during design process

An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants ' comfort?

A.

LEED AP

B.

Leasing Agent

C.

Facilities Manager

D.

Commissioning (Cx) Agent

Which of the following stakeholders are involved in the feedback mechanism?

A.

Occupants

B.

Civil Engineer

C.

Landscape Architect

D.

Building Energy Modeler

LEED certification steps generally proceed in which of the following order?

A.

Project Registration, Application Preparation, Submission, Application Review, Certification

B.

Application Preparation, Application Review, Project Registration, Submission, Certification

C.

Select LEED rating system, Submission, Application Review, Project Registration, Certification

D.

Application Preparation, Project Registration, Application Review, Submission, Certification