USGBC LEED-Green-Associate - LEED Green Associate GAFRE Exam (LEED GA)

Page: 5 / 13
Total 430 questions

The protection and restoration of natural vegetation, wetland areas and bodies of water through building footprint consolidation helps to

A.

minimize hardscape

B.

prevent light pollution

C.

support conservation programs

D.

preserve open space and sensitive areas

Good site design benefits a project in which of the following ways?

A.

Makes occupants comfortable by providing green spaces

B.

Supports access to diverse land uses, sustainable food and services

C.

Provides access to public transportation and employment opportunities

D.

Protects endangered species and maximizes development of previously undeveloped areas

Which of the following is an important reason for reducing the use of potable water in buildings?

A.

Reduces the impact of waste on the storm water system

B.

Improves the health and safety of building occupants

C.

Limits the amount of energy required for water treatment and pumping

D.

Prevents flooding in low-lying areas

Which of the following represents a unit of carbon dioxide equivalent that is reduced, avoided, or sequestered to compensate for emissions occurring elsewhere?

A.

Green power

B.

Demand response

C.

Carbon offsets

D.

Renewable energy

Which strategy can be used during the building process and after occupation to reduce waste?

A.

Implement a recycling program

B.

Use certified lumber for framing

C.

Use grey water for flushing of toilets

D.

Develop a Sustainable Purchasing Policy

In which LEED rating category does a Built Project fall into?

A.

LEED for Building Design and Construction

B.

LEED for Interior Design and Construction

C.

LEED for Operations and Maintenance

D.

LEED for Neighborhood Development

The maximum number of credits that can be achieved under Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is

A.

30

B.

31

C.

33

D.

35

According to the LEED Minimum Program Requirements (MPR) specifying minimum occupancy rates, a project must serve how many occupants?

A.

One or more Full Time Equivalents (FTEs)

B.

Five FTEs for six months

C.

50% of occupancy based on code

D.

At least two FTEs, no later than SIX months after Commissioning (Cx)

Which of the following tools should be used to identify indoor environmental issues and prepare a corrective action plan to make necessary changes?

A.

Thermal sensors

B.

Occupant surveys

C.

Life-cycle assessments

D.

Mixed-mode design calculations

Which is a Demand Response strategy?

A.

The Commissioning process

B.

Community Planning

C.

Tiered demand electricity pricing

D.

Energy load analysis