Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

USGBC LEED-Green-Associate - LEED Green Associate GAFRE Exam (LEED GA)

Page: 1 / 13
Total 430 questions

Which of the following narratives explains the relationship between prerequisites and credits for purposes of LEED certification?

A.

Not all credit categories have a prerequisite

B.

Prerequisites are mandatory and credits are optional

C.

Prerequisites are mandatory if credits are pursued in the specific category

D.

Credits are assigned the same base points and prerequisites are weighted

Which type of site Is appropriate for development of LEED projects?

A.

Floodplain

B.

Greenfield

C.

Brownfield

D.

Undeveloped

A building owner has set a goal of reducing water use by 20% for the upcoming year. Which of the following strategies will aid in reducing indoor water demand to achieve the water reduction goal set by the owner?

A.

Installing dual-flush toilets

B.

Collecting rainwater in cisterns

C.

Installing building-level water meters

D.

Using potable water for flush functions

In a new building which of the following is an effective way to confirm a building ' s performance compared with performance goals design specifications and the Owner ' s Project Requirements?

A.

Perform Commissioning (Cx) activities

B.

Provide staff training

C.

Purchase Renewable Energy Certificates (RECs)

D.

Establish design and energy goals

Which of the following power sources are considered green power?

A.

Natural gas

B.

Biomass

C.

Nu clear

D.

Clean coal

The Location and Transportation (LT) credit category encourages which of the following strategies?

A.

Reduce the urban heat island effect

B.

Build on a previously disturbed site

C.

Encourage views to the exterior

D.

Reduce landscape water use

Which of the following practices ensures that building systems are designed efficiently, installed appropriately and operate as intended?

A.

Positive feedback loop

B.

Negative feedback loop

C.

Building commissioning

D.

Building retrocommissioning

Use of which of the following can help reduce the heat gain and peak air temperatures?

A.

A drip irrigation system

B.

Pervious paving materials

C.

Low albedo paving materials

D.

High reflectance roofing materials

If a project incorporates daylighting, in which category should the project team seek points for implementing this strategy?

A.

Energy and Atmosphere

B.

Innovation

C.

Indoor Environmental Quality

D.

Sustainable Sites

Flush out process is performed to remove which of the following?

A.

voc

B.

Waste

C.

Graywater

D.

Blackwater