When considering water conservation and water-efficient landscaping, which two types of water would be most useful for landscape irrigation?
During the pre-design phase of a three-story office building, the project team determines that the anticipated energy use of the proposed building will exceed the Owner's Project Requirements (OPR). What strategy should the project team consider in order to lower the building's energy use?
The LEED credit weightings. in regard to the most important environmental impacts and human benefits, are based on impact categories defined and established by the
As of 1996, the Montreal Protocol banned the production of what chemical compound known to have ozone-depleting potential?
Materials that would otherwise be discarded but are incorporated into a new building are considered to be
Which strategy promotes sustainable purchasing during construction?
Sustainable forestry is the practice of maintaining forest resources to meet the long-term forest product needs of humans while maintaining the
An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants' comfort?
What is the term for collecting, reprocessing, marketing and using materials that are diverted or recovered from the solid waste stream?
A project team has three principal participants with LEED AP credentials. One is an energy modeler, one is a civil engineer and the third one is a general contractor. Under which category can their credentials contribute a point?