A manufacturing company is implementing Dynamics 365 Supply Cham Management.

Bill of materials (BOMs) must be calculated using standard cost principles.

Miscellaneous charges must be included in the unit cost price. The explosion mode must arways be enforced as single level.

You need to configure the system to meet the requirements.

Which configuration should you enable for each requirement? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

A company plans to implement routing and route postings.

You must direct positing of route cards based upon the route group at Report as finished. You set the start default order for route posting to Never and the Report as finished to Route Group Dependent.

You set up the route group as shown below.

Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.

NOTE: Each correct selection it worth one point.

You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.

You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.

You need to set up this item as a full visibility catch weight item.

Which two steps must you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Assign the item a Tracking dimension group with active serial number control

B.

Assign it a Serial number group with per qty. defined as 1.

C.

Assign a Tracking dimension group with batch number as the only active tracking dimension.

D.

Create an inter-class unit of measure conversion between boxes and carats.

A manufacturing company uses time and attendance in Dynamics 365 Supply Chain Management.

An employee discovers an error after a time and attendance record is approved and transferred. The payroll transfer has not been run. However, the time has been posted against the production order.

You need to reverse the transferred registrations.

What happens to the production order time posting?

A.

Negative values are offset through manual posting.

B.

Transactions are offset and neutralized.

C.

The production order is ended.

D.

The Production Report as Finished journal is posted.

A company produces custom-made bicycles that offer many different configurations.

Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.

You create the following configuration groups: Frames, Wheels

You need to ensure that users can only select valid combinations of frames and wheels.

In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the same sub assembly item and resource sanding process.

You observe an Increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce. You must make a permanent change to the number of units the resource can produce for all future orders.

You need to adjust the process quantity on the route operation.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

You are using the manufacturing execution module in Dynamics 365 Supply Chain Management. License plate labels must be printed for products in the Report as finished step. You need to use the manufacturing execution functionality that meets this requirement. What should you use?

A.

Work templates

B.

Load planning workbench

C.

License plates

D.

Job card device

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear on the review screen.

A manufacturing company produces electronic components and devices.

The company has scheduling issues related to using working time calendars in manufacturing.

You need to ensure that the working time calendar is used when manufacturing jobs are scheduled.

Solution: Disable route groups for a process job type.

Does the solution meet the goal?

A.

Yes

B.

No

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

You need to implement the scheduled Kanban requirements.

Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.