Refer to Exhibit:

A Foundation install must be done on four NX nodes for a new customer. A consultant need to set up the network onsite before imaging the nodes through the Foundation tool.

The nodes are equipped with two SFP28 25GbE NICs with dual ports, and a 10GBase-T NIC with dual ports as well The customer’s ToR switches are 25GbE datacenter switches, already in production.

What is the appropriate hardware to perform the most reliable imaging of these NX nodes?

A.

A flat Ethernet switch, 4 compatible IGBase-T GBiCs, five Ethernet cables and a laptop.

B.

The 25GbE production switches. 4 DAC cables and 5 Ethernet cables with a flat Ethernet switch, and a laptop.

C.

A flat Ethernet switch. 9 Ethernet cables, and a laptop.

D.

The 25GbE production switches. 4 DAC cables, only one Ethernet cable with a 10GBase-T GBIC, and a laptop.

An administrator protected a DB VM running on a Nutanix cluster with NearSync Replication, which schedules to repeat every 15 minutes â–¡ to a second site. The daily change rate is low. During nightly backups, the replication window is missed due to write volume.

Which two options describe the expected behavior? (Choose two.)

A.

NearSync stops working and fails over to the remote site.

B.

Protection Domain transitions back to the hourly schedule.

C.

The Administrator needs to re-enable it manually.

D.

The system continuously tries to get to the NearSync schedule.

A consultant discovers that while the Foundation VM and the consultant's laptop are able to ping each other nodes are rea discovered while trying to run Foundation on the customer's network.

What should the consultant do to resolve the issue?

A.

Connect to same switch as the cluster and ping.

B.

Install Java on the Foundation VM.

C.

Enable IPv6 and multicast on the switch.

D.

Enable IPv6 and multicast on the laptop.

An administrator is migrating 5MB shares from a third-party platform to Nutanix Files with the following characteristics:

• Shares contain user profile directories

• DFS-N will be used

How should the administrator create target shares for this migration?

A.

Create multiple general purpose shares and distribute migrated data as evenly as possible.

B.

Create multiple distributed shares and distribute migrated data as evenly as possible.

C.

Create standard shares with multiple top-level directories and distribute migrated data.

D.

Create distributed shares with multiple top-level directories and distribute migrated data.

A customer asks where to find the passwords used for initial cluster configurations.

Which document contains the requested information?

A.

Project Closeout

B.

Pre-Delivery Questionnaire

C.

Deployment Questionnaire

D.

As-Built Document

An administrator is deploying several new application VMs to a Nutanix cluster. The application is very transactional with a 28/72 random, read/write ratio.

What should the administrator do?

A.

Add a minimum of four SSDs to each node to ensure all writes go to the SSDs.

B.

Add a minimum of four virtual disks to each VM, and aggregate them on guest OS level.

C.

Add one large SSD to each node and enable Flash Mode for the VMs.

D.

Add one large virtual disk to each VM. and use it for all application data.

For several days, an administrator notices the following alerts:

• CVM NIC Speed Low Warning Alerts

• Warning Alerts of CVM NIC not performing at optimal speed

• CVM is disconnected from the network Critical Alert

• Network Visualization page shows excessive dropped packets on CVM/Host

Which steps should be taken to determine which problem should be addressed first?

A.

• Access the Hardware Page to verify resources are available

• Analyze ail CVM Speed Alerts in the Alerts/Events page

• Analyze output for the network and interface properties and connectivity issues

B.

• Verify Host/CVM connectivity on the Network Visualization page

• Use to verify the bridge and bond configuration

• Review alerts/events page for the CVM disconnected error

C.

• Review Alerts page for NIC speed alerts and alert timing

• Analyze the genesis.out log file for process failures

• Assess the NIC properties in the Network Visualization > Host Properties page

D.

• Restart networking services on the CVM

• Determine the current configuration of the affected CVM via output

• Access the Alerts/Events page for the CVM network connection failures

The networking team makes changes to the Top of Rack switches to which the Nutanix cluster are attached. A few VMs are able to communicate with each other on the same node but are unable to connect to other parts of the network.

What is the likely cause of this issue?

A.

There is a VLAN misconfiguration on the VMs.

B.

The vNIC port is disconnected on the affected VMs.

C.

There is a VLAN misconfiguration on the switch.

D.

Jumbo Frame are misconfigured across ports.

Which container advanced setting should be configured to prevent ISO container images from exceeding a 100GB limit.

A.

Reserved capacity

B.

Advertised capacity

C.

Erasure coding

D.

Compression

An administrator needs to forecast infrastructure requirements for a new program and its associated applications. Prior to the projected start of the new program, all existing applications will be decommissioned.

How should the administrator perform this task?

A.

Check the Disregard Existing Workloads radio button in the Runway scenario.

B.

Check the Disregard Existing Nodes radio button in the Runway scenario.

C.

Add up the recovered workloads and manually remove from the Runway configuration.

D.

Power down the workloads during a maintenance window and run the Capacity Runway.