NCARB PDD - ARE 5.0 Project Development and Documentation Exam
An architect is designing a school building that features a flat roof with a low parapet wall in a wet climate region. The client wants to minimize maintenance requirements and focus on keeping water from the walls.
What parapet coping detail would be most appropriate for the architect to select for this project?
Which of the following admixtures is used to greatly increase the slump of concrete?
The architect has completed 60% of the construction documents. The owner wants to establish the guaranteed maximum price (GMP) at this point before 100% of the construction documents are complete. Several flooring finish items are still undetermined.
What should be included in the project manual to make sure the contractor has a cost to cover all finishes?
An architect has a contract with a local school district to redesign a school reception office to ensure a more efficient interaction between office staff, students, and parents. The following instructions are given to the architect:
The renovation scope is limited to the footprint only of the existing reception office.
Additional staff is not proposed for the renovated area.
The existing ceiling and associated fixtures will be protected from damage during construction.
The construction of the renovation must occur during the 10-week summer break.
Which of the following series drawings should be included in the documents set?
Specifications and details for repointing deteriorated masonry joints in historic soft-brick buildings should result in which one of the following?
During the documentation of an office building, the owner requests a fitness center amenity be added to the scope. The mechanical engineer informs the architect that the mechanical unit currently located on a utility mezzanine will need to increase in size to accommodate the required increased capacity.
Who should the architect confirm with that the larger unit will work in this location?
In an air-conditioned space in a tropical environment, roof insulation is being applied above a structural deck. In order to avoid problems related to condensation, where should the vapor barrier be installed?
For which of the following reasons is sheet piling used? (Check the three that apply)
In winter conditions, when the outdoor air is below freezing and the indoor humidity is maintained at 40 percent relative humidity for 24 hours a day, ice forms on the exterior surface of the stone facing.
Which of the following elements is missing from the building wall section?
Which of the following methods of mortar joint finishing has the greatest weatherability?