All of the following are communication tools EXCEPT _________.

A.

Memos

B.

Verbal circulation of a rumour

C.

video conferencing

D.

Inputting data into a spreadsheet

The major project scope management processes include:

A.

Change order control

B.

Initiation

C.

Program evaluation

D.

Scope validation

Parametric Estimate Costs involves:

A.

Calculating individual cost estimates for each work package

B.

Using rates and factors based on historical experience to estimate costs

C.

Using the actual cost of a similar project to estimate total project costs

D.

Both A and B

Maintenance should ________.

A.

Be considered part of the project life cycle because it is part of the total life cycle costing needed to do benefit/cost analysis in Collect Requirements

B.

Be part of the work breakdown structure to give the total scope of the required activities and effort

C.

Not be considered as a part of the project life cycle

D.

Be managed carefully because it is often a source of scope creep

A relatively small number of causes typically produce a majority of the problems and defects is a concept of ___________.

A.

Edward Deming

B.

phil'P Crosby

C.

Juian

D.

Pareto

Who is the person responsible for obtaining funding for a new project's conceptual study?

A.

Project manager

B.

President

C.

Chief financial officer

D.

Project sponsor

A contingency plan is executed when _______.

A.

A risk is identified

B.

An identified risk occurs

C.

When a workaround is needed

D.

All of the above

The quality team for the project consists of several groups. Which of the following project participants plays the most important role in the quality function?

A.

Customer

B.

Project Manager

C.

Project Team

D.

Vendors and Suppliers

A structured tool, usually industry or activity specific, used to verify that a set of required steps has been performed is called __________.

A.

Quality Policy

B.

check List

C.

Trend Analysis

D.

Paieto Diagram

The work that must be done in order to deliver a product with the specified features and functions is called __________.

A.

Product scope

B.

Staffing scope

C.

The project

D.

Project scope

Which of the following is true concerning the evaluation criteria?

A.

Can often be found in procurement documents

B.

Can be objective or subjective

C.

Used to rate or score proposals

D.

All of the above

Which of the following contract types places the greatest risk on the seller?

A.

Cost-plus-fixed-fee contract

B.

Cost-plus-incentive-fee contract

C.

Fixed-price-incentive fee contract

D.

Firm-fixed-price contract

The process of evaluating overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards is called __________.

A.

Quality Assurance

B.

Quality Control

C.

Plan Quality

D.

Quality Review

Which of the following is a method for quantifying qualitative data in order to minimize the effect of personal prejudice on source selection?

A.

Weighting System

B.

Screening System

C.

Selecting System

D.

None of the above

The PERT method is MOST used in situations where

A.

if Is important to know the inter relationships of activities

B.

Little is known about the cost estimated related to the project

C.

Little experience exists on which to base estimated of activity duration

D.

Resource requirements are well define