New Year Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

Scrum PSD - Professional Scrum Developer 1 (PSD I)

Page: 2 / 5
Total 163 questions

If multiple teams are working on the same product, each team should have its own product owner

A.

False

B.

True

Who creates tests on a Scrum Team? (choose the best answer)

A.

The Scrum Master.

B.

The Product Owner.

C.

Quality Assurance Specialists.

D.

The Developers.

Choose two benefits of Continuous Integration. (choose the best two answers)

A.

It eliminates bugs completely.

B.

It leads to higher transparency and rapid feedback for the team.

C.

The build is executed once every night and at least once each weekend.

D.

It can increase collaboration within the Developers.

Which best describes the Product Backlog? (choose the best answer)

A.

It is allowed to grow and change as more is learned about the product and its customers.

B.

It provides just enough information to enable a Scrum Team to start the design phase of a product.

C.

It is baselined to follow change management processes.

D.

It contains all foreseeable tasks and requirements from which the Scrum Team can develop and maintain a complete project plan.

Which of the following describes an architecture spike?

A.

A fundamental architectural problem found in an existing application

B.

The result of an exhaustive architectural planning effort

C.

A small development activity to learn about technical elements of a proposed solution

D.

A decision made by a systems architect to settle disagreement amongst the developers

Improvements that are outcome of the sprint retrospective can be added to the sprint backlog for the next sprint.

A.

True

B.

False

Which three of the following are feedback loops in scrum?

A.

Release planning

B.

Daily scrum

C.

Sprint review

D.

Sprint retrospective

E.

Refinement meeting

How much time must a product owner spend with the developers?

A.

However much time the developers ask the PO to be present

B.

40%, or more depending on stakeholders

C.

100%

D.

Enough to be aware of the increment’s value at the sprint review

What is the practice of branching code in a version control system?

A.

Combining two or more branches of code into a single code base

B.

Creating a copy of existing code, isolated from the original code

C.

Releasing a specific codebase into a production environment

D.

Tagging or labeling a particular codebase as production ready

Select three criteria for the definition of done

A.

Code review is done

B.

Acceptance tests pass

C.

Regression tests pass

D.

The product is released at the end of every sprint

E.

Code coverage 90%