True or False: User Stories are required in the Product Backlog.

A.

True

B.

False

What is an integration test?

A.

A test of the user interface

B.

A test that runs during a continuous integration build

C.

A test of multiple units of functionality

D.

A test of a single unit of functionality

When more teams are working on the same product. How should they go about their definition of done?

A.

Every team must make their own DoD, a meeting should be organised so that the differences are known.

B.

It depends on the product owner

C.

All development teams must have a DoD that makes their combined work releasable.

D.

Every team uses its own. The differences are discussed in a hardening sprint.

The developers can invite experts to the sprint planning to give them advice

A.

False

B.

True

When are testers and QA experts ideally included in the project?

A.

After every sprint review

B.

From the beginning and throughout the sprints, but let's call them developers

C.

When the developers are done

D.

When the product is complete

When is a system's architecture decided? (choose the best answer)

A.

It is designed along with the vision, before the first Sprint.

B.

In the beginning of the project, during Sprint 0.

C.

Before writing code.

D.

Throughout development, as understanding emerges.

What is the commitment for the product backlog?

A.

Product goal

B.

Sprint goal

C.

Sprint planning outcome

D.

Definition of done

The practice of decomposing a requirement into failing tests is called:

A.

Behavior driven development

B.

Scrum testing

C.

Regression testing

D.

Acceptance test driven development

How is architecture decided in a scrum team during a project?

A.

The developers emerge architecture as the system is created

B.

The architect works in the early part of each sprint to define the architecture of that sprint

C.

Upfront designs are presented to the developers prior to the first sprint

D.

The architecture cares for itself as code is written and deployed

E.

An architect on the team undertakes all architecture tasks

A Scrum Team is required to deliver a Done Increment by the end of a Sprint. Select two statements that explain what Done means. (choose the best two answers)

A.

Ready to be released to end users.

B.

Whatever the Product Owner defines as quality.

C.

No work is left to meet the Definition of Done.

D.

Ready for integration.

E.

All work the Developers are willing to do.