NABCEP PVIP - PV Installation Professional (PVIP) Board Certification

Page: 5 / 5
Total 160 questions

A worker is installing modules on a roof 20 feet above grade. What OSHA fall protection is required?

A.

Guardrails only

B.

Personal fall arrest system

C.

Safety net system

D.

Any of the above

A ground-mount PV system is planned for a site with a soil bearing capacity of 2000 psf. The array footing design requires a minimum bearing pressure of 1500 psf. What is the safety factor for this installation?

A.

0.75

B.

1.33

C.

1.5

D.

2.0

A PV array’s tilt is 15° at a latitude of 35°N. What is the annual energy loss compared to optimal tilt?

A.

1-2%

B.

3-5%

C.

6-8%

D.

10-12%

A PV system has a nameplate capacity of 10 kW DC and operates with a total system derate factor of 0.85. What is the expected AC output power under standard test conditions (STC)?

A.

7.5 kW

B.

8.5 kW

C.

9.0 kW

D.

10.0 kW

An installer troubleshooting a ground-mounted array finds It to be performing as expected most of the time, but a ground-fault error is indicated on hot days. The inverter is in a shaded location. Which of the following should the installer check for FIRST when troubleshooting this array?

A.

High voltage

B.

Loose module connections

C.

Pinched module wiring

D.

Intermittent ground connections

Which of the following requires a UL listing or its equivalent?

A.

System manuals

B.

Lag screws

C.

Grounding electrode clamp

D.

System labels and markings

Which temperature coefficient is used in the calculation to verify energy production of a PV system?

A.

OptionA

B.

OptionB

C.

OptionC

D.

OptionD

A PV system’s annual energy production is 15,000 kWh. After maintenance, production increases by 5%. What is the new annual output?

A.

15,500 kWh

B.

15,750 kWh

C.

16,000 kWh

D.

16,250 kWh