Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

BCS TAE - ISTQB Certified Tester Advanced Level-Test Automation Engineering

Page: 2 / 2
Total 40 questions

Consider the followingexample of TAS metrics.

Time to execute automated tests

Speed and efficiency of TAS components

Which of the following statements is TRUE?

A.

A and B are both internal TAS metrics

B.

A is an internal TAS metric and B is an external TAS metric

C.

A and b are both external TAS metric

D.

A is and external TAS metric and b is an internal TAS metric

Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.

Which of the following would you expect to be the MOST specific risk associated with this scenario?

A.

The connectivity from the TAS to the dedicatedtest interfaces will not work

B.

The process of configuring the TAS will be error-phone due to manual intervention

C.

The automated test cases will not contain the expected result

D.

False alarms, that are unlikely to occur in the real world, will be observed during testing