Users are being prompted for a username and password when trying to access archived items.
Which setting can the administrator change to prevent the prompt?
Which two tasks must be performed after configuring the Outlook Web Access (OWA) Data Access account? (Select two.)
Which component can be placed on a non-clustered resource?
An Outlook 2010 user contacts the Help desk in reference to an Veritas Enterprise Vault 12.x issue. The user is requested to provide the Enterprise Vault Outlook Add-In version. Where can the user locate this information in Outlook 2010?
An administrator is preparing to move the Veritas Enterprise Vault 12.x for Exchange (EV) server to new hardware. The EV indexes and vault stores have been backed up. Which two customized components of EV should be backed up and available for the move? (Select two.)
Which task requires the permissions of the Vault Service Account as a minimum in Veritas Enterprise Vault 12.x?
For which two platforms is Enterprise Vault Office Mail App available? (Select two.)
A backup administrator is recovering from a system crash. The Veritas Enterprise Vault 12.x for Exchange (EV) SQL databases and Vault Store partitions have been recovered. Which two additional components are required to restore the EV server? (Select two.)
An administrator creates a rule to tag all items which include Social Security Numbers with a “PII†tag. The administrator runs the policy in Test Mode and reviews the report to verify the tag will be applied to the expected items. The administrator then disables Test Mode and runs the policy; however, the tag fails to be applied to the expected items and the Test Mode report continues to be generated.
Which action should the administrator perform to ensure the tag is applied to the expected items and the report is generated in production mode?
An administrator views the Indexing subtasks and notices a ‘Change Location’ subtask with the status ‘Waiting’.
Which step must complete before the subtask will continue processing?