Outputs of the Control Communications process include:
Which group creativity technique asks a selected group of experts to answer questionnaires and provide feedback regarding the responses from each round of requirements gathering?
Which type of analysis is used to examine project results through time to determine if performance is improving or deteriorating?
A project management office manages a number of aspects including the:
Which Develop Schedule tool and technique produces a theoretical early start date and late start date?
An input required in Define Scope is an organizational:
The procurement process that documents agreements and related documentation for future reference is known as:
When would resource leveling be applied to a schedule model?
A work package has been scheduled to cost $1,000 to complete and was to be finished today. As of today, the actual expenditure is $1,200 and approximately half of the work has been completed. What is the cost variance?
An output of Control Schedule is:
Which component of the human resource management plan describes when and how project team members are acquired and how long they will be needed?
What is an objective of the Develop Project Team process?
Which of the following processes are part of the Project Integration Management Knowledge Area?
When can pre-assignment of project team members occur?
The formal and informal interaction with others in an organization industry, or professional environment is known as:
What is the number of stakeholders, if the project has 28 potential communication channels?
Who selects the appropriate processes for a project?
Identifying major deliverables, deciding if adequate cost estimates can be developed, and identifying tangible components of each deliverable are all part of which of the following?
Which tool and technique identifies inefficient and ineffective policies, processes, and procedures?
Which type of contract is most commonly used by buying organizations because the price for goods is set at the outset and is not subject to change unless the scope of work changes?
The process of identifying and documenting the specific actions to be performed to produce the project deliverables is known as:
Which tools or techniques will a project manager use for Develop Project Team?
What is the probability of occurrence if the risk rating is 0.56 and the impact if the risk does occur is very high (0.80)?
Conflict should be best addressed in which manner?
An output of the Create WBS process is:
Which type of analysis would be used for the Plan Quality process?
An output of the Develop Project Team process is:
A project manager is creating a project charter to provide a direct link between the project and the organization's strategic objectives. What must be considered when creating this document?
The completion of the project scope is measured against the:
Using the three-point estimating technique, if the most likely duration is four months, the optimistic duration is two months, and the pessimistic duration is one year, how many months is the expected activity duration?
A project manager has created an issue log to document issues communicated by project team members during weekly team meetings. This is an input of:
Plan-do-check-act is also known as:
The application of knowledge, skills, tools, and techniques to project activities to meet project requirements describes management of which of the following?
Under which type of contract does the seller receive reimbursement for all allowable costs for performing contract work, as well as a fixed-fee payment calculated as a percentage of the initial estimated project costs?
How should a stakeholder who is classified as high power and low interest be grouped in a power/interest grid during stakeholder analysis?
Which input will be used when tasked with developing the human resource plan?
The contract in which the seller is reimbursed for all allowable costs for performing the contract work and then receives a fee based upon achieving certain performance objectives is called a:
Which Control Scope input is compared to actual results to determine if corrective action is required for the project?
Which is one of the determining factors used to calculate CPI?
An input to the Collect Requirements process is the:
Which of the following change requests can bring expected future performance of the project work in line with the project management plan?
In the basic communication model, which term refers to the method that is used to convey the message?
Which of the following is a statistical concept that calculates the average outcome when the future includes scenarios that may or may not happen?
Which technique is utilized in the Control Schedule process?
The processes required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project has been undertaken to achieve are grouped within which Process Group?
What is project management?
The technique of subdividing project deliverables into smaller, more manageable components until the work and deliverables are defined to the work package level is called:
When cost variance is negative and schedule variance is positive, the project is:
Which of the following is an output of the Conduct Procurements process?
What is one of the objectives of Project Risk Management?