Which class of UPS is ideal for data centers?

A.

VFD (Voltage and Frequency Dependent)

B.

VI (Voltage Independent)

C.

VFI (Voltage and Frequency Independent)

D.

First class

Smoke sensors must be installed in the computer room. What is the minimum density?

A.

1 per 5 m²

B.

1 per 10 m²

C.

1 per 25 m²

D.

1 per 40 m²

What is the main disadvantage of using a ToR (Top of Rack) design?

A.

A single ToR (Top of Rack) switch is more expensive than an EoR (End of Row) switch.

B.

You need a separate rack to install all your ToR (Top of Rack) switches.

C.

There will be more switches to manage.

D.

A ToR (Top of Rack) switch has only optical interfaces.

The noise levels in the data center are approximately 91 dB (A).

Do employers need to take precautions?

A.

No, anything less than 100 dB (A) is acceptable.

B.

There are no regulations regarding noise levels inside a building. Regulations only apply to noise pollution outside of the building.

C.

As long as the data is compliant to ISO/IEC 27001 it is acceptable.

D.

Yes, since it is mandated by regulations.

What indicates the overcurrent of a fuse or breaker?

A.

The maximum inrush current an overcurrent protection device can handle within a defined period of time

B.

The maximum electrical current which can flow in a particular electrical system under short-circuit conditions; it is determined by the voltage and impedance of the supply system

C.

The current at which the device will trip

D.

The current that a fuse or breaker is able to interrupt without being destroyed or causing an electrically damaging arc

You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F. Calculate the approximate CFM required to cool the equipment in the rack.

A.

Approximately 1,500 CFM

B.

Approximately 1,000 CFM

C.

Approximately 500 CFM

D.

Approximately 160 CFM

Management requests a 15-minute battery bank at full UPS load. UPS specs:

    30 kVA, PF 0.8

    Battery 384 V (192 cells), end discharge 308 V

    Inverter PF 0.8, 400 V output

What information is missing to perform the calculation?

A.

UPS efficiency

B.

Inverter efficiency / output PF

C.

Load imbalance

D.

Available battery charging current

In order to save energy, you are going to install an automated system to switch off lights. What should be taken into consideration when installing such a system?

A.

Security guards should perform regular inspections verifying the system works.

B.

The system should not be based on motion detection as the lights might suddenly switch off while staff is still at work.

C.

It is not advisable to use such a system since it will reduce the lifetime of LED lighting.

D.

At all times, the levels should allow for security cameras to function properly.

What is needed to determine the Relative Humidity (RH)?

A.

Wet bulb temperature, local atmospheric pressure, and calculator

B.

Dry bulb temperature, airflow, and conversion table

C.

Cold surface with dew collection counter

D.

Dry bulb temperature, wet bulb temperature, and psychrometric chart

A data center requires an audit to find out whether it conforms with ANSI/TIA-942 Rated-3 (concurrently maintainable).

Will the network architecture be part of this audit?

A.

No, as concurrently maintainable only applies to electrical and mechanical (power and cooling).

B.

Yes, but only if the network administration does not comply with ANSI/TIA-606.

C.

Yes, amongst other aspects, the network architecture should be Rated-3 compliant with the requirements of ANSI/TIA-942.

D.