SMRP CMRP - Certified Maintenance & Reliability Professional
A process system consists of two units,A and B. "Unit A" feeds "Unit B." such that if either unit is not operating, the system is not operating. Given the data below, calculate the annual Reliability of the system. The system is in continuous operation
Unit A Reliability =0.40
Unit B Reliability = 0.32
t = 1 year
For maximum effectiveness maintenance tasks should be allocated to:
Which of the following tasks should be used to incorporate changes to process and equipment?
1.Use an accepted risk analysis process when a change is made
2.Use a database to record equipment failures
3.Use change procedures and policies to document changes
4.Use cross-functional teams to conduct safety, operability. and maintainability reviews
What is the preferred method of obtaining failure information from operator rounds when the consequences of failure are severe and there is reason to doubt whether the tasks will be done without a formal reminder?
A maintenance manager has a spreadsheet list of all of the equipment failures that have occurred at the plant (facility) over the past three years. Which of the following analytical methods or tools might be used to sort and prioritize the list?
Who should be responsible for communicating and enforcing company policy from management to the shop-floor?
When developing and presenting a new strategic plan to stakeholders, which of the following is the most important?
Determining the optimal replacement time for spares (spare parts) with an unacceptable interval, needs to account for:
Which of the following is least likely to be linked to Maintenance and Reliability process improvements?
When would a strategic plan for Maintenance and Reliability be most appropriately required?