Which of the following is a key characteristic of a management review? [1]

A.

Used to assess project risks

B.

Used to check consistency of and deviation from the system requirements

C.

Run by a moderator

D.

Conducted by an external group to assess process compliance

You are reviewing the project's traceability matrix after the first cycle of testing. You have discovered that new requirements have been introduced and others have

changed.

What should you do? [2]

A.

Assign the new requirements to a maintenance release, update the test documentation for the changed requirements.

B.

Ask for more time and budget for testing.

C.

Update the "lessons learned" document to avoid future issues similar to this.

D.

Re-assess the test coverage.

Which one of the following metrics would be MOST suitable for helping to determine whether test analysis and design is complete? SELECT ONE OPTION

A.

Percentage of requirements linked to passed test cases.

B.

Number of testability defects found in the requirements.

C.

Number of test cases automated versus planned.

D.

Number of product risks covered by test conditions.

What is the purpose of tracking efficiency metrics for a formal review? [1]

A.

These metrics can be used to determine who participated in the review.

B.

These metrics can be used to determine if the review was a good use of resources.

C.

These metrics can be used to determine the quality of the reviewed object.

D.

These metrics can be used to determine the speed with which defects were fixed.

Which of the following should be considered the biggest risk to the schedule when trying to implement formal scripted test cases early in the SDLC for a system with a

large GUI front end? [2]

A.

Early implementation might uncover errors in the design documentation.

B.

Test maintenance might be required due to changes in the presentation layer.

C.

The testers will be working on analysis and design early in the schedule.

D.

The developers may feel pressured not to change anything.

SCENARIO 1

DreamPartner dating agency are redesigning their dating application following a major security breach in which sensitive customer data was made publically available. The redesign includes stronger security encryption and performance tuning.

The product risk register for the redesign project, which was produced after all requirements had been agreed, includes the following:

The organisational Test Strategy contains the following objectives:

1. A Risk-based lest approach must be adopted for all projects

2. Functional regression testing should start as soon as functional testing is complete

3. Automated tests may be run before or in parallel with manual tests

The project Test Plan has allocated 6 weeks to complete all test execution, with functional testing taking 3 weeks to execute, performance and security testing 2 weeks each and regression testing 1 week.

Which of the following options places the test suites (TS1 to TS5) in the correct order for test execution?

SELECT ONE OPTION

A.

TS3, TS1, TS2, TS5, TS4.

B.

TS1, TS2, TS5, TS3, TS4.

C.

TS3, TS4, TS1, TS2, TS5.

D.

TS5, TR1, TS3 TSA, TS2

Your test team is in the process of completing final regression testing one week before the release date. One of your staff has just uncovered a critical defect that causes

data corruption.

What should you do? [2]

A.

Update the risks in your test plan to cover data corruption issues and update your test cases to be sure you test for this in the future

B.

Write a high priority defect and follow the escalation communication plan as defined in your test plan

C.

Write a high priority defect and call the business stakeholders to warn them about it

D.

Update the weekly status charts and change the project status to red

Which of the following is an advantage of specifying test conditions at a detailed level? [1]

A.

Can be used to identify test coverage gaps

B.

Saves time

C.

Can be used to leverage use cases for acceptance testing

D.

Improves maintainability and reduces ownership costs for the testware