Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection?
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?
Which of the following elements does MRP take into account during net requirement
calculation? Note:
There are 2 correct answers to this question.
What is the difference between co-products and by-products?
Which materials have a negative quantity in a bill of material or in a recipe?
Note: There are 3 correct answers to this question
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
What does a line hierarchy in repetitive manufacturing represent?
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements?
Note: There are 2 correct answers to this question