Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

EMC D-ISM-FN-23 - Dell Information Storage and Management Foundations 2023 Exam

Page: 6 / 6
Total 189 questions

What does using a service-focused approach provide to managing the storage infrastructure?

A.

Determines the optimal amount of storage space needed in a backup storage system

B.

Provides hardware-specific management tasks that are automated

C.

Determines the appropriate workflow upon receiving a service provisioning request

D.

Provides detailed information on configuration, connectivity, and component interrelationships

A Fibre Channel switch has eight ports and all ports must be operational 24 hours 7 days. However, a failure of Port 5 occurs on a particular week as follows:

Monday = 11 AM to 3 PM -

Thursday = 6 AM to 11 AM -

Saturday = 11 AM to 4 PM -

What is the availability of Port 5 in that week?

A.

91.6%

B.

94.6%

C.

95%

D.

90%

An organization wants to replicate data over a public network to a cloud.

Which security control mechanism helps to secure the data during replication?

A.

LUN masking

B.

Data shredding

C.

Data compression

D.

Encryption

A company plans to deploy a new application in their environment. The new application requires 5 TB of storage space. During peak workloads, the application is expected to generate 3000 IOPS with a typical I/O size of 3 KB. The capacity of each available disk drive is 750 GB. In addition, the maximum number of IOPS a drive can perform at with a 70% utilization is 90 IOPS.

What is the minimum number of disk drives needed to meet the application’s capacity and performance requirements for a RAID 0 configuration?

A.

7

B.

34

C.

50

D.

40

What is an accurate statement about governance?

A.

Creates the policies and enforces their adherence

B.

Ensures removal of data security vulnerabilities

C.

Determines strategy and operational rules by which companies are directed and managed

D.

Restricts access privileges to certain legitimate users to avoid IT managed resource conflicts

A Fibre Channel switch has eight ports and all ports must be operational from 8 AM to 8 PM, Monday through Friday. However, a failure of Port 7 occurs in the week as follows:

Monday = 11 AM to 12 PM

Wednesday = 4 PM to 9 PM

Thursday = 4 AM to 9 AM

Friday = 2 PM to6 PM

Saturday = 9 AM to 1 PM

What is the availability of Port 7 in that week?

A.

75%

B.

83.3%

C.

80%

D.

68.3%