Exin EX0-008 - Agile Scrum Foundation

Page: 2 / 2
Total 59 questions

According to Agile principles, what should be the pace of development?

A.

Fast

B.

Increasing

C.

Sustainable

What is an "escaped defect"?

A.

A defect that was found by the customer.

B.

A defect that was planned to be fixed, but not fixed in a Sprint.

C.

A defect the Continuous Integration System failed to catch.

A 200 member project team is working on a large and complex system with multiple sub-systems. They would like to start using the Agile Scrum methodology.

As a Scrum Master, what would your best advice be?

A.

Scrum is not suited for such a large project. The team should clearly use the Waterfall method or the Crystal Clear method.

B.

Ask all potential members of the project team to have a meeting first and decide if they agree to use Scrum.

C.

Agree a logical sub-division of the system so that smaller Scrum teams can work on sub-systems and can add tangible value.

A team selects a Product Backlog Item (PBI) for the Sprint Backlog.

What must a team do to finish the Product Backlog Item it selects?

A.

As much as can be done in the Sprint before the deadline.

B.

As much as is required to satisfy the definition of 'done'.

C.

Analyze, design, program, test and document the PBI.

What is the usual length of the time box for the complete Sprint Planning meeting?

A.

Four hours for a 30 day Sprint, one to two hours for a shorter Sprint.

B.

However long it takes to complete the Sprint Backlog.

C.

Never more than two hours, regardless of Sprint length.

How should 'done' be defined when multiple teams are working on a single product?

A.

All teams must have the same definition of 'done'.

B.

Each team must define and use their own definition of 'done'.

C.

The Scrum Master defines when the item is 'done'.

The Product Owner is going on a three-week vacation. The team should be closing the current Sprint and starting a new Sprint at the end of the first week of the Product Owner's vacation.

What is the best way to continue the Scrum rituals in this situation?

A.

Each Scrum team should ideally have two Product Owners to provide cover.

B.

The Product Owner should be requested to delay his vacation by a week.

C.

The Scrum Master should take over and cover for the Product Owner.