SAP E_S4CON_2505 - SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
