Month End Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

SAP E_S4CON_2505 - SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade

Page: 1 / 2
Total 40 questions

You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correctanswersto this question.

A.

Activation of dictionary objects in phase ACT_UPG

B.

Import of upgrade and language data from the download directory in phase TABIM_UPG

C.

Generation of the new ABAP loads in phase RUN_SGEN_GENER8

D.

Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

E.

Import of dictionary objects from the download directory in phase DDIC_UPG

You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results? Note: There are 2 correctanswersto this question.

A.

SYCM (Simplification Database Content)

B.

ATC (ABAP Test Cockpit)

C.

SE80 (Object Navigator)

D.

SAT (Runtime Analysis)

Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correctanswersto this question.

A.

Custom code analysis

B.

Software update

C.

Unicode conversion

D.

Database migration

You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step. Where can you change this during the migration via the Utilities option of the SUM UI? Note: There are 2 correctanswersto this question.

A.

In DMO Migration Preparation

B.

In SUM Parameters

C.

In SUM Phaselist

D.

In Process Control Center

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correctanswersto this question.

A.

DMO without system update

B.

SAP S/4HANA conversion without DMO

C.

Prerequisite check

D.

Benchmark tool

E.

SAP S/4HANA conversion including DMO

What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

A.

To optimize the conversion

B.

To optimize the main import

C.

To optimize the migration

D.

To optimize the activation

What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correctanswersto this question.

A.

SAP ECC system from SAP ERP 6.0 EHP 8

B.

Standalone AS ABAP with SAP_BASIS 752 and above

C.

SAP Solution Manager 7.2

D.

SAP S/4HANA Server 1809 and above

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

A.

During the Execution roadmap step

B.

During the SUM technical downtime

C.

Before the start of the SUM technical downtime

D.

After SUM has ended

Which of the following are valid options to check the progress of an inplace SUM DMO run? Note: There are 2 correctanswersto this question.

A.

Check the dump size of the database export on disk.

B.

Check the log files written in the SUM directory, subdirectory abap, subdirectory log.

C.

Check logs for jobs starting with RSUPG_SGEN in the SAP system.

D.

Check the Charts Control Center in the SUM UI.

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel. Why are 40 Process Buckets executed in parallel?

A.

These are 40 pairs of R3load processes, so there are 80 R3load processes running.

B.

There is a maximum of 40 parallel R3load processes within this specific phase.

C.

SUM is still running in uptime; the 40 defined R3load processes are considered.

D.

The number of CPU cores does NOT allow more than 40 R3load processes to be run in parallel.