Huawei H19-260_V2.0 - HCSA-Sales-Smart PV V2.0

Page: 2 / 2
Total 60 questions

Which of the following devices is not mandatory in the PV+ESS on-grid scenario?

A.

Module

B.

Whole-house backup box

C.

Inverter

Huawei smart I-V diagnosis support string-level fault locating.

A.

True

B.

False

Which of the following is not a feature of the residential PV+ESS on-grid scenario?

A.

Grid-connected residential PV+ESS system

B.

Composed of PV and ESS systems

C.

Unstable mains or frequent power outages

Which of the following data is included in the POS report submitted by partners?

A.

Return data of SR's lower-level partners

B.

ST sales data to lower-level partners

C.

SO sales to end customers data

D.

Return Data for SOR End Customer

When goods such as energy storage products are stacked in the warehouse, if necessary, you can unpack them to facilitate storage.

A.

True

B.

False

Which of the following statements about the design principles of the medium-voltage micro-grid solution is incorrect?

A.

Ratio PV inverter power and PCS power ≤ 1:1

B.

The number of PCSs corresponding to each ESS must be the same.

C.

A diesel generator must be configured for the micro-grid to prevent the system from losing the black-start power supply after the energy storage is exhausted.

D.

PCS power/Peak power in steady state ≥ 2.0

Be cautious when unloading goods. Violent loading and unloading are not allowed.

A.

True

B.

False

Under the premise of complying with local laws and regulations, partners at all levels are allowed to carry out distribution business only within the authorized regions.

A.

True

B.

False