Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

Huawei H19-260_V2.0 - HCSA-Sales-Smart PV V2.0

Page: 1 / 2
Total 60 questions

Traditional inverters use the manual string shutdown solution to disconnect equipment internal fault or PV modules fault.

A.

True

B.

False

Which region currently has a carbon tax?

A.

Middle East and Africa

B.

Asia

C.

European Union

D.

Latin America

Which of the following is not a key SQA role? ( )

A.

Customer voice feedback provider

B.

Safety and quality culture builder

C.

Safety and quality requirement practitioner

D.

Safety and quality result guardian

Which of the following is the quality guideline of Huawei Digital Power? ( )

A.

Win with quality and build industry-benchmark quality.

B.

Raise a sense of responsibility.

C.

Do the right thing at the first time.

D.

Stick to the zero defect (ZD) principle and try to create values for customers and partners.

Which of the following features can reduce O & M costs?

A.

Support on & off-grid switchover

B.

TOU

C.

Automatic SOC calibration

D.

Top explosion venting (relief pressure in the top direction)

Which of the following statements about the Huawei AFCI function is incorrect?

A.

Maximum detection current range is greater than 30 A. 100% PV modules are tested.

B.

Detection distance is only 80 m, covering 99% of the rooftops.

C.

Huawei Intelligent Arc Protection, which automatically shuts down the arc within 0.5s

D.

Precise locating and 100% fault identification

If the SQA finds that the safety and quality requirements are not met, the SQA shall communicate with the business personnel for confirmation. The opinions of the business personnel shall prevail.

A.

True

B.

False

Which of the following are included in the Data Center Facility Pre-sales Specialist Certification?

A.

Power

B.

Modular DC

C.

Cooling

D.

As we all know, Huawei measured the performance on usable capacity of the battery pack optimizer after the construction of a power station in Tangshan. At that time, what is the improved ratio in the average discharged capacity of the enabling optimizer compared with the forbidding optimizer?

A.

2 - 2.5%

B.

5 - 10%

C.

1 - 1.5%

D.

0.3-0.5%

How does the traditional solution ensure the security of the PV DC side?

A.

Fuse

B.

DC combiner box

C.

Manual disconnect switch

D.

AC switch