USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED v5 AP BD+C)
Under the Energy and Atmosphere Credit, Optimize Energy Performance, what method should display lighting use for establishing allowable lighting power?
A building owner installs a building automation system (BAS) to allow programmable load control. Which of the
following credits can be pursued because of the installation?
Which of the following cannot be classified as graywater?
Sustainable Sites Credit, Site Assessment requires evaluation of
Which of the following will result in a higher demand for potable water use in irrigation?
Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted,
manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The
intent of this bonus is
For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?
A rectangular office building is located in an extremely humid climate and is shaded by very large adjacent buildings
on all four sides. If the building owner wants to decrease the annual energy cost for operating the building, which of
the following would be the best design approach?
Which of the following scenarios contributes to earning credit under MRc1: Materials and Resources, Option 2. Materials Reuse?
In an area where carbon-emission regulations are becoming progressively stricter, the goal is to future-proof the building for complete electrification and eliminate on-site fossil-fuel combustion. Which of the following measures can the project team use to maximize the building’s readiness for electrification while minimizing on-site combustion sources?
