An office building design has demonstrated reductions in landscape water use of 30% over baseline and indoor water use of 40%. These reductions qualify the project for:

A.

Four points for Water Efficiency Credit, Indoor Water Use Reduction

B.

Zero points because the Water Efficiency Prerequisites are not met

C.

One point for Water Efficiency Credit, Outdoor Water Use Reduction

D.

One point for Water Efficiency Credit, Outdoor Water Use Reduction and four points for Water Efficiency Credit, Indoor Water Use Reduction

A project team compares a life-cycle assessment (LCA) model to a baseline design to determine the reductions in six impact categories. One impact category exceeds the baseline by 7%. Which alternative analyses should the team run to check different impact measurements?

A.

Change the orientation of the design case building

B.

Optimize the slab depth of the design case building

C.

Decrease the gross floor area of the baseline building

D.

Increase the wall mass and types of windows in the baseline building

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

A.

Compliance Path 2: Usage-Based Calculation; prescriptive compliance confirmation

B.

Compliance Path 2: Usage-Based Calculation; appliance water calculations

C.

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.

Compliance Path 1: Prescriptive Achievement; product cutsheets

For an emergency care facility project, which of the following credits can be achieved if the total cost of

permanently installed products are 25% cradle-to-cradle V3 Gold and 25% GreenScreen List Translator?

A.

Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Material Reuse

& Innovation Credit, Innovation, Exemplary Performance

B.

Materials and Resources Credit, Furniture and Medical Furnishing, Option 3. Multi-Attribute Assessment of

Products & Innovation Credit, Innovation, Exemplary Performance

C.

Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2.

Material Ingredient Optimization & Innovation Credit, Innovation, Exemplary Performance

D.

Materials and Resources Credit, Furniture and Medical Furnishings, Option 3. Multi-Attribute Assessment of

Products & Materials and Resources Credit, Building Product Disclosure and Optimization, Material Ingredients, Option 2. Material Ingredient Optimization

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an "anticipated" credit

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

A.

Site Assessment

B.

Site Development - Protect or Restore Habitat

C.

Heat Island Reduction

D.

Light Pollution Reduction

In order to achieve the requirements of LEED, the Electrical Vehicle Supply Equipment (EVSE) must comply with:

A.

State, but not regional standards established for electrical vehicles operated within the state of vehicle operation

B.

Regional, state, or local standards for the electrical connectors to be used

C.

Level 1 charging capacity (110 volts AC)

D.

Manufacturer's standards established for electrical vehicles operated within the state of vehicle primary operation

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

A.

A, B, C

B.

B, C, D

C.

C, D, E

D.

A, B, D

What type of space should a project team ensure is made available in order to attain the Sustainable Sites Credit, Joint Use of Facilities, Option 1: Make Building Space Open to the General Public?

A.

Locker rooms

B.

Office of the principal

C.

Health clinic

D.

Auditorium

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

A.

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.

University campus land areas within 1/2 mi. (0.80 km) of the project boundary