A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give to the project owner?

A.

Modify the design to enclose the performance areas

B.

Calculate the return on investment over the 20-year life of the project

C.

Compare the energy consumption against an alternative

D.

Inform the owner that the LED fixture is exempt from Sustainable Sites Credit, Light Pollution Reduction

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

A.

Wall

B.

Steel

C.

Glass

D.

Concrete

The Lakeside Resort is located approximately 60 mi. (96.6 km) from the nearest town. Occupants are expected to arrive primarily by automobile, and existing public transportation consists of approximately one bus trip per day.

The project wants to earn as many Location and Transportation (LT) credits as possible. Which of the following strategies helps achieve points under LTc3: Compact and Connected Development, Option 2. Access to Transit?

A.

Offer a private shuttle that runs occupants into the nearest town and to local attractions with a minimum three-year commitment. Build a covered transit shelter for occupants to use while they wait for the shuttle.

B.

Implement a carpool incentive program that gives guests and employees incentives to carpool to the project and from the project to local attractions and into town.

C.

Count the bus trip(s) from the project to the local town and the bus trips occupants can connect with once they are in town. The project anticipates 70 possible rides per day on weekdays and 27 on weekends with all bus options combined.

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

A.

The ESC plan cannot be modified during the design phase of the LEED certification

B.

The ESC plan can be developed or modified during the design phase of LEED certification

C.

A compliant ESC plan may be developed during construction

D.

A compliant ESC plan must be in place when the commissioning authority is appointed

U.S. Green Building Council (USGBC) ' s vision for using LEED internationally includes

A.

allowing more stringent credit requirements for countries outside of the U.S. so that all projects can achieve LEED

B.

creating multiple LEED rating systems for different countries

C.

modifying U.S. reference standards, such as ASHRAE 90.1, to be more appropriate for regions outside the U.S.

D.

providing opportunities for alternative compliance paths that meet the unique needs of a particular region

The LEED AP is leading the first design charrette for a new LEED project with the project ' s owners. What document should be used to record the project goals to be used throughout the design of the project?

A.

Owner ' s Project Requirements (OPR)

B.

Owner ' s list of wants and needs

C.

Criteria for contractor selection

D.

Basis of Design (BOD)

Every location in the U.S. identifies how many regional credits?

A.

Four

B.

Five

C.

Six

D.

Seven

A likely outcome of IPc1: Integrative Design Process would be to:

A.

Relocate the project to another site

B.

Decide to downsize an energy-related system

C.

Define the LEED boundary

D.

Finalize the credits to be pursued

Which group of chemicals emitted by some building materials is linked to asthma, chronic obstructive pulmonary disease, and cancer?

A.

Nitrogen Oxides (NOx)

B.

Polyvinyl Chlorides (PVCs)

C.

Chlorofluorocarbons (CFCs)

D.

Volatile Organic Compounds (VOCs)

The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction

Practices?

A.

$10,000

B.

$12,500

C.

$22,500

D.

$25,000