USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED AP BD+C)

Page: 3 / 13
Total 404 questions

For Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan, which of the following

items is required for credit compliance?

A.

MERV 13 (F7) filtration media

B.

Indoor Environmental Quality test results

C.

Photographic documentation

D.

Separating construction waste

A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of

supply air for the entire building flush-out?

A.

3,500,000 ft3 (99 108 m3)

B.

10,000,000 ft3 (283 168 m3)

C.

14,000,000 ft3 (396 435 m3)

D.

35,000,000 ft3 (991 089 m3)

A design team is working on a hospital project. In order to meet the Energy and Atmosphere Prerequisite, Minimum

Energy Performance, what option is used?

A.

Whole building simulation

B.

EPA target finder rating tool

C.

Green-e Energy

D.

Advanced building core performance guide

How can the additional energy needed to increase the ventilation in a building be mitigated?

A.

Use economizer strategies

B.

Use higher-rated MERV filters

C.

Use high-pressure drop filters

D.

Reduce the size of the ventilation ductwork

Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

A.

Supply air velocity

B.

Number of occupants

C.

System ventilation efficiency

D.

Supply air temperature set point

Which strategy can maximize the efficiency of water use in an irrigation system?

A.

Determine a set rate of irrigation and avoid adjustments

B.

Set the irrigation controllers on a timer

C.

Incorporate precipitation sensors with smart irrigation controllers

D.

Space irrigation sprinkler heads for overlapping coverage

What is the system boundary that a building life cycle analysis must be defined to account for?

A.

Cradle-to-gate

B.

Cradle-to-grave

C.

Cradle-to-cradle

D.

Cradle-to-building

In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

A.

must be calculated using at least 20% from an alternative water source

B.

must be calculated using 100% potable water

C.

may be included or excluded from the calculations

D.

may be calculated using a standard 20% reduction from baseline

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

A.

The credit is not feasible for this project

B.

The credit may be achieved by using nonroof measures only

C.

The credit is applicable for projects that document this special condition

D.

The credit can only be achieved by using an alternative compliance path

A project team is attempting Location and Transportation Credit, High Priority Site, and selects Option 1: Historic District. To demonstrate that the project is in an infill site, the project team must confirm that:

A.

At least 75% of qualifying land areas within ¾ mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within ½ mile (0.80 km) are previously developed

C.

The site is a brownfield as defined by the Environmental Protection Agency (EPA)

D.

The project is a Federal Renewal Community site