For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because

A.

SRI generally increases with age

B.

SRI generally decreases with age

C.

SRI generally remains the same with age

D.

SRI generally does not impact the Heat Island Effect

Which of the following categories is included in a human impact assessment for LEED projects to guide planning, design, and operations?

A.

Historical landmarks

B.

Demographics

C.

Soil composition

During a review of the HVAC equipment submittal, the Commissioning Authority (CxA) determined that the contractor substituted a higher efficiency piece of equipment. Which of the following is the priority for the CxA to consider?

A.

Energy meter location

B.

Equipment Maintenance Plan

C.

Owner's Project Requirements

D.

Coordination of other contractors

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

A.

Roadway distance

B.

Straight line distance

C.

Rail freight distance

D.

Air freight distance

Which of the following are control measures recommended by the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) for the Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan?

A.

Source control

B.

Material selection

C.

Contractor training

D.

Pre-construction meeting

Which of the following LEED credit data should be used for a comprehensive 25-year carbon-emissions projection for a new building project?

A.

EAp5: Fundamental Refrigerant Management

B.

WEp1: Water Metering and Reporting

C.

MRc4: Building Product Selection and Procurement

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following must be included in the Basis of Design (BOD)?

A.

Training requirements

B.

Allowable tolerance for facility operations

C.

Facility, system and assembly performance assumptions

D.

Environmental, energy efficiency and sustainability goals

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

Which of the following will contribute to reducing the heat island effect?

A.

Artificial turf grass

B.

Intensive vegetated roof

C.

Steep sloped roof with initial SRI of 35

D.

Low sloped roof with initial Solar Reflectance Index (SRI) of 64