Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

A.

Owner

B.

Contractor

C.

Occupants

D.

Facility manager

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?

A.

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Interior Lighting

B.

Indoor Environmental Quality Credit, Low-Emitting Materials and Sustainable Sites Credit, Site Assessment

C.

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Minimum Indoor Environmental Quality Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

A building owner in an arid climate is trying to design an outdoor lunch area for the tenants. Which landscaping strategy is important to employ in order to reduce water demand?

A.

Large maple trees for shading

B.

Xeriscaping landscape beds

C.

Turf grass area for picnic benches

D.

Tropical flowers next to park benches

A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

A.

91 lighting control devices

B.

93 lighting control devices

C.

100 lighting control devices

D.

103 lighting control devices

A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?

A.

Utility cost savings over the lifetime of the system must offset the higher initial cost

B.

Higher initial cost must exceed the cost of the utility over the lifetime of the system

C.

Higher initial cost must exceed the savings on the utility cost over the lifetime of the system

D.

Utility cost savings over the lifetime of the system must be lower than the higher initial cost of the system

An electrical team installs photovoltaic panels over a parking lot. This action contributes to which of the following credits?

A.

Optimize Energy Performance

B.

Light Pollution Reduction

C.

Low-Emitting Materials

D.

Demand Response

How can the additional energy needed to increase the ventilation in a building be mitigated?

A.

Use economizer strategies

B.

Use higher-rated MERV filters

C.

Use high-pressure drop filters

D.

Reduce the size of the ventilation ductwork

In a large industrial or commercial building, which energy end uses are classified as systems composed of discrete pieces of equipment that can be metered together for the purposes of Energy and Atmosphere Credit, Advanced Energy Metering?

A.

HVAC air system for air conditioning

B.

Electrical lighting system during peak use hours

C.

Water flow system used for public faucets and toilets

D.

Condenser water system with a cooling tower and condenser water pumps

When should a preliminary water budget analysis be conducted?

A.

At the time the design development is completed

B.

At the time the plumbing contractor is selected

C.

After completion of schematic design

D.

Before completion of schematic design