Pre-Winter Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

USGBC LEED-AP-BD+C - LEED AP Building Design + Construction (LEED v5 AP BD+C)

Page: 8 / 14
Total 442 questions

In the calculations for Water Efficiency Credit, Outdoor Water Use Reduction, food gardens

A.

must be calculated using at least 20% from an alternative water source

B.

must be calculated using 100% potable water

C.

may be included or excluded from the calculations

D.

may be calculated using a standard 20% reduction from baseline

A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?

A.

Site ' s impervious cover

B.

Project density calculations

C.

Erosion and sediment control plan during construction

D.

Air quality as a result of off gassing that occurs as concrete cures

Which of the following is required to earn Energy and Atmosphere Credit, Renewable Energy Production if using a Solar Photovoltaic System?

A.

Carbon offsets

B.

Daylighting strategies

C.

Passive solar strategies

D.

Produced electricity consumed on-site

The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?

A.

Increases the overall solar reflectance (SR) of the hardscape area

B.

Increases the rainwater infiltration capacity

C.

Decreases the amount of bicycle parking that must be provided

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010

A design team working on a new building in a coastal city is considering climate resilience strategies. The team refers to the Intergovernmental Panel on Climate Change (IPCC) Sixth Assessment Report to incorporate different emissions scenarios on projected climate changes.

The design team can use emissions scenarios to enhance the climate resilience of their building project by utilizing the:

A.

Scenarios consistent with current global policies and historical emissions trends

B.

Mid-range scenarios, as they are most likely to occur

C.

Scenarios appropriate for the geographic location of the project that take into account local climate action plans

Which practice is recommended for protecting HVAC systems during construction to maintain indoor environmental quality and enhance occupant quality of life?

A.

Maintain extreme-heat protection

B.

Use low-emitting materials

C.

Install temporary air filters

A new facility has a comprehensive advanced energy metering system that measures energy consumption across multiple subsystems. The facilities manager aims to use this data to enhance energy management practices and improve overall building performance.

The facilities manager can utilize the advanced energy metering system to optimize energy use and reduce costs in the new student center by:

A.

Adjusting the setpoints of the HVAC system based solely on outdoor temperature changes

B.

Using automated alerts from the metering system to address sudden spikes in energy use

C.

Scheduling regular audits for all installed lighting systems to ensure compatibility with energy meters

A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.

The original hospital achieved the Gold certification level and was built with the capacity to add three floors—levels six through eight—to the top of the structure. This addition requires partial demolition of the roof and the floor below.

The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.

The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.

The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.

The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.

The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.

The project team is designing the maternity ward to increase patient interaction with the vegetated terraces and green roof to promote healing and reduce recovery time. Which of the following credits or prerequisites can be achieved through this design approach?

A.

EQc2: Occupant Experience

B.

SSc1: Biodiverse Habitat

C.

IPp2: Human Impact Assessment

A building in a rural area with an FAR of 1.7 is planning to pursue a point under SSc2: Accessible Outdoor Space. Which of the following criteria will help the project achieve the credit?

A.

Driveways designed with paver blocks

B.

A space dedicated to community gardens

C.

Covered car park

D.

A permanent and secure bicycle repair station