AACE International PSP - Planning & Scheduling Professional (PSP) Exam
Who will receive the most benefit from a master schedule of the Spring Highway project?
For which of these delays should an owner grant a time extension?
During proofing of the product manual, a problem was discovered requiring 15 days additional time to effect a correction. How can the date of availability be maintained?
If a cost estimate assumes that 240 hours will be expended on a given activity, and the projected crew size expected to perform that activity is 5 personnel working and 8-hour workday, what is the calculated duration for the activity?
Crane operators require 1 hour prep and 1 hour clean-up and inspection per day. There is only 1 crane operator allocated per crane. Crane operators are not allowed to work more than 8 hours a day. Lunchtime break lasts 1 hour. Assuming a 10 minute cycle time, how many lifts per day can be expected?
When resource leveling craft labor for a critical path schedule, the scheduler
At a minimum, periodic reporting must be done at what interval?
The amount of time that an activity can be delayed from its early start date without delaying project completion is called:
Which of the following risks CANNOT be estimated by BILCO with only a resource-loaded schedule?
Which of the following is NOT input data to the construction planning process?