AACE International PSP - Planning & Scheduling Professional (PSP) Exam
Theoretically construct a summary activity for activities 2001 through 2004. Using the "normal" schedule, what is the cost of the hammock?
How could the structural steel drawing delay have been prevented?
Management has determined the need to release the product 20 days earlier than planned. What tasks need to be expedited?
What is the actual duration as of the status date or data date of Activity B?
Which of the following will NOT affect the total float calculation of a non-resource leveled schedule?
What owner action could have mitigated the late completion of the project?
Determine the correct formula and date for the late finish for Activity 6002.
Which of these letters, symbols or words best approximates the graphical shape of a project's cumulative BCWS?
When reconstructing a CPM schedule electronically from a hardcopy, which of the following is NOT required to determine the critical path?
In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):