The congested site only has room for 3 cranes to operate concurrently. Only 1.75 cubic yard ICY] or1.34 cubic meter [CM] concrete buckets are available. Each crane can perform up to 35 lifts per day. Assuming a total of 30 lifts per crane pet day. what is the maximum volume of concrete that could be placed using 3 small tower cranes over a 5-day period?
Estimate to complete (ETC) is __________________.
Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?
By subtracting a measured unit productivity rate during an impacted period from the unit productivity rate during an unimpacted period, the resulting value represents:
Budgeted cost of work scheduled is _______________________.
Which of the following project planning situations is the most frequent contributor to cost overruns?
Considering the information provided for the project, what is the factor that most influences the successful crashing of the schedule?
Determine the driving activity for Activity 10001.
If after calculating a schedule an activity exhibits negative total float, which of the following is certain? The activity
Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT