AACE International PSP - Planning & Scheduling Professional (PSP) Exam
In its simplest form, what is the main drawback of critical path method scheduling?
There is only enough room for a maximum of 4 cranes to be placed on-site. Assuming that a single crane can perform 35 lifts per day and that a column pour requires 60 lifts, what is the minimum number of tower cranes that should be used for the above described column pours?

What day would Activity C complete if the duration of Activity A was reduced by five days?
If someone wanted to constrain a project's end date so that any project slippage would cause negative float, they would do so by using
The sum of all budgets for work scheduled to be accomplished within a given time period is the ____________.
What are Phases based on and derived from?
If after calculating a schedule an activity exhibits negative total float, which of the following is certain? The activity
When are project planning and scheduling specifications established?
What activities are concurrent to Activity 2001 in the "normal" schedule?

Using the "normal" schedule, if you start Activity 7001 on April 1, 2002, and using a 5-day workweek, what the finish date for Activity 7001?