AACE International PSP - Planning & Scheduling Professional (PSP) Exam
Using the normal schedule, what is the owner's total cost of the project?
Time-scaled logic diagrams are
When should the project documents be reviewed to assess their impact on the organization and administration of a project?
Who can define KPls?
For the late finish for Activity 11001, select the most appropriate response for transitioning from the forward pass.

Project Life Cycle Phases do NOT include the following item:
Which of these letters, symbols or words best approximates the graphical shape of a project's cumulative BCWS?
Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?

SUBCO is a potential concrete bridge contractor based in a metropolitan area 300 miles away from your project. They have offered to supply manpower and equipment t BILCO at a per diem rate of $3,000 above their direct labor and equipment rates. In doing a cost benefit analysis, which of the following is NOT a consideration?
Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?