iSQI TMMi-P_Syll2.1 - TMMi Test Maturity Model Integration Professional (TMMi-P)
In many cases the achievement of a given TMMi level needs specific support from CMMI practice areas. Which of the following CMMI version 2 practice areas provides support for TMMi level 3?
A test process assessment has been performed at a small local bank. The assessment revealed that testing is performed by business analysists on an ad-hoc basis, in addition to their regular work. There are no defined test functions and testing is not considered to be a career path within the bank Which of the following process areas would need specific attention to address the above mentioned shortcoming?
Improvement models can have a staged and/or continuous representation. The TMMi has been developed as a staged model. Which of the following statements is NOT true regarding a staged model?
Which type(s) of evidence collection is required with a formal TMMi assessment?
The three TMMi level 5 process areas, Defect Prevention, Quality Control and Test Process Optimization, all provide support for continuous process improvement.
Which of these process areas is specifically aimed at identifying new testing technologies that may be appropriate and to transition them into the organization?
Which of the following statements is FALSE?
Which of the following statements is FALSE about the level 5 process area Defect Prevention?
An organization is facing too many defects occurring during production. As a consequence, an important test improvement goals for the next improvement cycle is to improve the quality (effectiveness) of the test cases.
Which of the following specific practices needs to be addressed, in the context of the improvement goal, as part of SG 1 “Perform Test Analysis and Design using Test Design Techniques†of the Test Design and
Execution process area?
Which of the statements about the Learning Phase of the IDEAL improvement framework is the TRUE?
Which test level can NOT be improved using the TMMi model?