What are the possible Master Data Maintenance options for SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question

A.

The SAP IBP, add - in for Micorsoft Excel

B.

The Manage Master Data app

C.

The Planner Workspaces app

D.

The Planning Areas Model Configuration app

E.

The data Integration job app

What is a prerequisite for modelling outsourced manufacturers with production capacity using the Supply Optimizer?

A.

Model relative production costs across internal locations and outsourced manufacturing locations

B.

Use production lead times and offsets to manage components at the outsourced manufacturing location

C.

Ensure that the outsourced manufacturing locations have a separate subnetwork

D.

Model target inventory and stocks at the outsourced manufacturing location

You created a key figure and want to add calculations. Which of the following rules do you consider?

Note: There are 2 correct answers to this question

A.

All key figure calculation have calcuation inputs, which can be marked as stored or calucated

B.

The calculation chain for a key figure must always result in a calculated key figure

C.

Aggregation calculations using SUM or MAX functions must be based on a higher aggregation u level.

D.

Key figure can be calculated across the different planning levels

You are starting a new implementation project for SAP IBP and are considering the possible system architecture. What are the possible approaches for setting up the system landscape? Note: There are 2correct answers to this question

A.

Setup the two-tier landscape and have the configuration for development system regularly — updated from the production system

B.

Create additional planning areas in the test system to support training needs.

C.

Create additional test planning areas in the production system to support cutover needs

D.

Set up a three-tier landscape using transport, starting from the development system to test and — production

Which options can be used to reduce the runtimes of a time-series optimizer run? Note: There are 3 correct answers to this question.

A.

Keep the number of fairshare segments small

B.

Split into multiple planning areas to support weekly vs. daily planning needs.

C.

Use non-overlapping networks by using Subnetworks ID maintained at Location-Products to reduce the size of the problem

D.

Eliminate the usage of telescopic time buckets

E.

Increase the use of incremental lot size beyond the frozen horizon.

You are evaluating criteria for choosing the solver to support planning for a complex supply What are some of the points that should be reviewed? Note: There are 2 correct answers to this question.

A.

Finite heuristics works with demand prioritization

B.

Push and Pull production models are used by the optimizer

C.

Prioritization of demand elements one by one is achieved by unconstrained heuristics

D.

Planning results can be generated faster by the optimizer.

Which apps can be enhanced with analytical charts? Note: There are 2 correct answers to this question.

A.

Web-based Planning

B.

Intelligent visibility

C.

Planner Workspace

D.

Dashboards Advanced

You need to work in two separate sessions for two different SAP IBP tenants. What can help you differentiate the appearance of their user interfaces? Note: There are 2 correct answers to this question

A.

Define a different default planning area via the User Preferences

B.

Have a different set to tiles in the Home group of apps

C.

Set a separate theme for the Home page in the Web UI.

D.

Add the system name and tenant information from the About section to the Home pages

You are developing the functionality and appearance of the Excel UI for SAP IBP business users. Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note:There are 2 correct answers to this question.

A.

Changing the member names

B.

SAP IBP ribbon extension

C.

Chaging the entries from the Name Manager

D.

Changing the layout of the master data workbooks

What are some of the actions configurators can do when working correct answers to this question

A.

Delete key figure data for a date range for all versions at once

B.

Copy key figure data from any version to any version

C.

Copy master data from base version to other version

D.

Run an application job to purge obsolete versions