You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question

A.

Assign the header material of a material BOM as assembly to a task list operation.

B.

Assign the BOM usage for free assignment of material in Customizing

C.

Assign the header material of a material ROM to the assembly field of the task list header

D.

Assign a piece of equipment with allocated material BOM to a task list operation.

Which settings must be customized to set up Inspection Checklist processing? Note: There are 2 correct answers to this question

A.

Maintain settings at plant level for usage decisions.

B.

Create a control key which expects inspection characteristic assignments

C.

Assign an Inspection Type to a Maintenance Order Type and a Planning Plant

D.

Assign an Inspection Type to a Maintenance Order Type.

Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?

A.

Display approved purchase requisitions for which purchase orders have been generated.

B.

Display approved purchase requisitions for which NO purchase orders have been generated

C.

Analyze overdue maintenance orders that have NOT been finally confirmed

D.

Analyze confirmed maintenance orders that have NOT been settled.

E.

Analyze maintenance orders that are still in planning and have NOT been released.

You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?

A.

Material can be assigned at the order header level.

B.

For stock material you always need a reservation

C.

A goods issue can be entered for planned and unplanned material

D.

The pick list for materials can be printed before order release.

You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

A.

The effective costs are posted as a credit memo to a price difference account

B.

The effective costs are posted to the respective batch (valuation type).

C.

The goods receipt for the batch refurbished is posted with the value of the standard price.

D.

The goods receipt for the batch refurbished is posted with the value of the moving average price

What do you have to consider when planning maintenance work that is to be carried out by an external company?

A.

If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.

B.

In the control key assigned to the order operation, the "Service" indicator must always be activated.

C.

If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

D.

For the maintenance order type, you have to assign the Enhanced Procurement Mode.

Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question

A.

You can configure SAP S/4HANA Cloud via the self-service configuration UI.

B.

You have access to the SAP S/4HANA back-end system

C.

You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network

D.

You do NOT have access to the SAP S/4HANA back-end system.

You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question

A.

Set the call horizon to 25%.

B.

Set the call horizon to 75%

C.

Set the offset to 3 months

D.

Set the call horizon to 90 days.

What do you have to consider when setting up the refurbishment process?

A.

Assign valuation type C to the order type.

B.

Assign a view profile for refurbishment to the order type.

C.

Assign a stock determination rule to the PM order type

D.

Mark the order type for refurbishment in customizing.

What do you have to consider regarding a cross-plant planning scenario?

A.

Multiple maintenance plants are assigned to a planning plant (n: 1).

B.

Only a maximum number of five maintenance plants can be assigned to a planning plant.

C.

Multiple planning plants are assigned to a maintenance plant (m: 1).

D.

It is only possible within the same company code.